BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Demolition, site work and addition to a mixed-use development in Centralia, Illinois. Working plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

As of 3/5/2026, all bids have been rejected. No additional information is available at this time. The project consists of a new one-story addition to the north of the existing school. The exterior walls are concrete block with a brick facade and a low-pitched TPO roof. There is a 5% Bid Bond and also a Performance, Labor and Material Payments Bond. The project budget was discussed. It is estimated to be in the $750k-$1M range. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Owner clarified that the project is to be substantially complete by August 1, 2026 before school begins. Because of the required time of completion, liquidated damages will be added to the addendum and will be $1,000/day.

Final Planning

Educational

$1,000,000.00

Public - City

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
2
Bidding Soon
686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2026

May 18, 2026

Project location map

3601 IL-161, Centralia, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.