BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a sidewalk / parking lot in Colorado Springs, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000412547 Bid Intent Not Available El Paso County is soliciting bids from qualified, experienced, professional Contractors to furnish all materials, labor and equipment necessary for the El Paso County Pedestrian Crossing Improvements - Construction Package #3 Project, which generally includes construction of improvements that are in conformance with the Americans with Disabilities Act (ADA), the Manual on Uniform Traffic Control Devices (MUTCD), and current El Paso County standards at various locations with old, outdated pedestrian crossing signal technology, that are not ADA compliant, or need safety improvements such as signage, striping, additional sidewalk/crosswalks, etc. These locations include school crossings, connections to schools, trails, transit, emergency services, and other pedestrian generators. This project includes improvements at the following ten (10) locations: Main Street at Norman Drive Main Street at Marquette Drive Constitution Avenue at Piros Drive Crestridge Avenue at B Street Fontaine Blvd. at Fountain Mesa Road Fontaine Blvd. at Metropolitan Street Fontaine Blvd. at Dartmouth Street Galley Road at Hathaway Drive Peterson Road mid-block crossing near Sequoyah Way Security Blvd. at Grand Blvd. TERM OF CONTRACT: The awarded contract is a Working Day Contract. The services called for shall be completed within one hundred and fifty (150) Working Days. The contract term, based on the contract execution, contract extensions, and working days, is anticipated to begin on or before April 15, 2026 and all work on the project must be completed prior to December 11, 2026, though the contract term may extend beyond that date. Construction Work shall commence, and the time count shall begin, upon receipt of the Notice to Proceed from the County's Project Manager. The contract term above is based on a working day estimation with additional term coverage to include landscape establishment period, permits, warranty, etc. Notwithstanding, it shall be understood and agreed that any required warranty period, if applicable, which exceeds this term shall remain in full force for the duration of the warranty period. Question Deadline 02/23/2026 at 10:00 AM MT Questions are submitted online Yes, For additional information please contact Jake Harper, CPPB Associate Procurement Specialist Email: JakeHarper@elpasoco.com Phone: (719) 520-6857 Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % This Project is subject to Davis Bacon requirements. There is a 0% DBE goal associated with construction of this project as well as 640 hours of On-The-Job Training (OJT). April 2026 (estimated) Contract Award

Award

Sidewalks / Parking Lot

$3,351,919.00

Public - County

Paving, Site Work

193

10

4

8

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
1,290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

April 15, 2026

Project location map

Multiple Locations, Colorado Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.