BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

New construction of an industrial development in Prosper Township, South Dakota. Completed plans call for the construction of a industrial development.

The project consists of a new pre-engineered metal building designed to accommodate shop space, parts storage, cold storage, offices, breakroom, restroom, and a mezzanine building. The contract scope is construction, and the contract terms are lump sum (fixed price, stipulated sum). These documents serve as an invitation to bid and request for qualifications from General Contractors for the construction of the project. Bids must be accompanied by a security deposit in the form of a bid bond of not less than 10 percent of the bid amount, or a certified check, cashier's check, or bank draft for 5% of the bid and any applicable alternates. Checks should be made payable to "City of Mitchell." Complete sets of procurement documents may be obtained from the Owner or viewed at the office of the Architect or specified construction plan rooms. Question Deadline 02/25/2026: Direct questions to Kevin Genzlinger, AIA NCARB, email; kevin@ciavarelladesign.com. Clarifications requested by bidders must be in writing not less than 7 days before date set for receipt of bids.

Award

Industrial

$1,968,000.00

Public - City

New Construction

57

23

35

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
23
Bidding Soon
445
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

May 1, 2026

Project location map

SD-37 & 256th St, Prosper Township, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.