Published May 2, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a civil project in Sterling, Massachusetts. Completed plans call for site work for a water / sewer project; and bridge / tunnel.
The project consists of the installation of approximately 850 linear feet of 12-inch HDPE storm sewer piping, 225 linear feet of 15-inch HDPE storm sewer piping, and 50 linear feet of 18-inch HDPE storm sewer piping along Swett Hill Road. It also includes the improvement of two culvert pipes and the installation of catch basins, storm sewer manholes, and appurtenances as specified in the contract documents. The work is subject to an Order of Conditions issued by the Sterling Conservation Commission and must be performed in accordance with its requirements. The work requires furnishing all labor, materials, and equipment to complete the work as shown on the Contract Drawings and as specified or implied. The owner reserves the right to eliminate or add sections of the work as determined to stay within available funds or as a basis of award. Each bid must include a Bid Bond, Cash, Certified Check or Treasurer's or Cashier's Check in the amount of five percent of the submitted bid as Bid Security. The successful bidder will be required to furnish Payment and Performance Bonds each in the full amount of the contract. Attention is called to minimum wage rate requirements, contract payment methods, and relevant Massachusetts General Laws. The owner reserves the right to reject any or all bids and limit the extent of work to stay within available funds. Doc.Note - All requests for mailing of Bidding Documents shall be accompanied by a separate nonrefundable handling and mailing fee in the amount of Twenty-Five Dollars ($25.00) in cash or check made payable to Haley Ward, Inc. One (1) set of Bidding Documents will be furnished for the deposit and mailing fee stated. Work Included: 1. The Work of this Contract is located in Sterling, Massachusetts on Swett Hill Road and along North Cover Road and Hall Avenue. 2. The work shall include but not necessarily be limited to providing all labor, materials, equipment and incidentals required to provide the following: a. 12-inch HDPE storm sewer piping. b. 15-inch HDPE storm sewer piping. c. 18-inch HDPE storm sewer piping d. And 24-inch HDPE storm sewer piping along Swett Hill Road. e. Install two stormwater detention basins with HDPE wick drains including all earthwork grading and impervious core along Swett Hill Road. f. Furnish and install catch basins, drain manholes including ones 9 ft to 14 ft in depth, flared ends, rip rap and appurtenances. g. Required road reconstruction includes temporary trench and permanent trench paving restoration. 3. Work subject to an Order of Conditions issued by the Sterling Conservation Commission. This document is appended. The contract work shall be completed in accordance with the requirements of this order. COMPS NO - 10214 Question Deadline 02/26/2026 To receive consideration, such questions shall be submitted in writing to the OWNER, with a copy to the ENGINEER, at least seven days before the established date for receipt of bids.
Bid Results
Water / Sewer
$561,840.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
April 13, 2026
Swett Hill Rd, Sterling, MA
Related To This Project
Sterling, MA
Bid Date: Jun 04 2026
Sterling, MA
Bid Date: Jun 04 2026
Sterling, MA
Bid Date: Oct 07 2025
Sterling, MA
Bid Date: Aug 07 2025
Sterling, MA
Bid Date: Aug 07 2025
Sterling, MA
Bid Date: May 15 2025
Sterling, MA
Bid Date: May 15 2025
Sterling, MA
--
Sterling, MA
Bid Date: Jun 04 2020
Sterling, MA
Bid Date: Oct 10 2024
Sterling, MA
Bid Date: Aug 30 2024
Sterling, MA
Bid Date: Sep 17 2020
Sterling, MA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.