BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2026 at 7:00 PM

Updated March 6, 2026

Renovation of an educational facility in Novato, California. Completed plans call for the renovation of a educational facility.

The scope of work is the Novato Charter School Reroofing Project. Each bid must be completed on the Bid Proposal Form included in the Contract Documents and must fully conform to this invitation, the plans and specifications, and all other Contract Documents. All bidders must submit their bids in accordance with the instructions provided, which include requirements for a bid security in the form of cash, cashier's or certified check, or a bidder's bond of not less than ten percent of the maximum bid amount. The successful bidder must comply with Labor Code provisions related to prevailing wages and apprenticeships, and is responsible for any rate changes. Bids must list subcontractors performing work exceeding one-half of one percent of the bid price and describe their work. Bids may not be withdrawn within sixty days after bid opening. Participation by minority, women, and disabled veteran contractors is encouraged. The project is subject to prevailing wage law, and bidders and subcontractors must be registered with the California Department of Industrial Relations. Bidders must have a valid California State Contractor's License, classification B, at the time the bid is awarded. Attendance at a mandatory bidders' conference at the project site is required for all prospective bidders. Question Deadline 02/26/2026 at 2:00 PM PT These requests shall be submitted in writing via email peter@greystonewest.com, cc: kristi@greystonewest.com at least five working days prior to the date the bid is due, Scope of Work Includes New Roof Overlay at (8) Modular Classrooms at Novato Unified School District's Charter School. New Roofing Shall Address Failed Roof and Leak Points Across Designated Roofs. Work Shall Include: . Removal of Modular Joint Covers on Roof . Removal of Solar Conduit and Wiring on Designated Roofs; Adhered Panels to Remain . Temporary Removal of Pre-fabricated Vents and Reinstallation Following Roof Installation . Installation of 8" 16ga. Plate Over the Modular Line and Fasten 6" O.c. On Both Sides . Mechanically Attaching (1) 3" Layer of Poly Iso. Insulation . Fully Adhering 60 Mil Fb in Bonding Adhesive . Termination of the Eaves With Nosing Into the (E) Gutters . Installation of a Raised-edge Detail Hooked Onto a Hold-down Cleat at the Head and Rakes Aside From the Removal of the First Item, the Existing Standing Seam Metal Roofing is to Remain And Be Prepared for New Roof Overlay.

Post-Bid

Educational

$389,000.00

Public - City

Renovation

10

16

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
18
Bidding Soon
1,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

April 6, 2026

Project location map

940 C St, Novato, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.