BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated March 5, 2026

Site work for a water / sewer project in Millwood, Washington. Completed plans call for site work for a water / sewer project.

The work involves furnishing all labor, equipment, and materials to construct approximately 820 lineal feet of 24" diameter watermain in Garland Avenue from Farr Road to Well No. 2 in Spokane County, Washington for Pasadena Park Irrigation District No. 17 as shown on the construction plans and described in the special provisions. Bidders may download plans and bid documents at no cost from Simpson Engineers Plan Room and are strongly encouraged to add themselves to the Bidders List to receive project notifications. Printed documents may be obtained at the bidder's expense from the provided link. Bids must be submitted on the forms provided in accordance with the specifications, with irregular bid proposals rejected. A cashier's check, certified check, or surety bond in the sum of five percent of the Total Project Bid must accompany the bid. The successful bidder must execute the contract within ten calendar days after receiving the contract and furnish a satisfactory performance bond within the stated time, or the bid proposal deposit shall be forfeited to the owner. Minority and disadvantaged business enterprises are encouraged to submit bids. The owner is using WSDOT's 2024 Standard Specifications and special provisions provided in the bid package.

Post-Bid

Water / Sewer

$900,000.00

Public - County

Site Work

5

4

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 3, 2026

Project location map

Garland Avenue from Farr Road to Well No. 2, Millwood, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.