BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Site work and paving for a civil project in Ashland, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

For a construction project consisting of replacing a culvert under Abinoojiyag Road. Project will consist of grading, drainage, aggregate base, culvert replacement, and bituminous surfacing as identified in Attached Bid Packet. Contractors will be required to provide the following insurances: Bid Bond of 20% of bid price submitted with bid Payment Bond of 50% of contract Performance Bond of 100% of contract. The Bad River Tribe's purchase/contracts shall be made in accordance with the subcontractor's provisions of the P.L. 93-638 contract. Davis Bacon Wage Rate will apply to this project. Indian preference will be given in accordance with P.L.93-638 Tribal TERO policies and ordinances will apply Questions can be directed to: Ben Connors Sr Roads Dept Manager Bad River Tribe Ph: 715-682-7111 ext 1343 Cell: 715-292-1728 Email: B.Connors@badriver-nsn.gov OR Cameron Corbine Civil Engineering Technician Bureau of Indian Affairs Phone: 715-292-1911 Email: Cameron.Corbine@bia.gov The Bad River Tribe reserves the right to reject any and all bids.

Bid Results

Bridges / Tunnels

$43,076.00

Public - City

Paving, Site Work

9

5

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
0
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

April 6, 2026

Project location map

Abinoojiiyag Road, Ashland, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.