Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a power facility in Naperville, Illinois. Working plans call for the construction of a power facility; and for site work for a power facility.
Bid is Cancelled. Contractor shall furnish and install all materials, labor, construction equipment, and supervision required to construct one (1) 34.5kV Switchgear building weather-tight, with all associated foundation, doors, roofing, lighting, receptacles, HVAC, drainage piping, building grounding, etc., in accordance with this specification, the attached drawings and Purchaser's schedule including all testing of the building lighting, receptacle and HVAC systems installed by Contractor as required to turn over to the Purchaser as "ready for occupancy" so that Purchaser may proceed with Purchaser's installation of the 34.kV switchgear and other associated equipment. City of Naperville is modifying their existing Tollway Substation to include the installation of a new masonry building that will house new 34.5kV indoor switchgear and associated control equipment. This building has been designed by others and the specification and drawings will be attached to this bid. This bid is being issued to procure the supply and construction of the new 34.5kV switchgear control building. The City's Tollway substation has seen several 34.5kV bus flashovers on both buses over the last couple of years. The primary cause of these failures was determined to be the amount of salt spray contamination, from the adjacent tollway, that forms on the bus insulators. Regular cleaning has proven ineffective and requires labor intensive periodic maintenance. As such, the Utility is looking to move its 34.5kV switchgear indoor into a new switchgear building which will be constructed as part of this bid. Question Submission Deadline:May 22, 2026, 12:00pm Question Response Deadline:May 25, 2026, 12:00pm All questions concerning the bid shall be submitted to the Procurement Services Team.
Final Planning
Power Plant
$1,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
November 13, 2026
171 Shuman Blvd, Naperville, IL