BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2026 at 8:00 PM

Updated March 23, 2026

Renovation of a military facility in Bridger, Montana. Completed plans call for the renovation of a military facility.

Install conduit on the exterior of the building from the main distribution panel to the interior wall behind the walk-in cooler, covering an approximate distance of 65 feet. Install a new 100-amp three-phase service feed from the main distribution panel to a new 100-amp three-phase subpanel located beside the existing electric forklift receptacle, using metal EMT conduit and copper THHN conductors. Remove the forklift breaker from the outdoor main distribution panel and install a new 100-amp three-phase breaker, then re-feed the forklift disconnect from the new subpanel to the existing receptacle, replacing conduit, wiring, and the receptacle if required. Provide electrical wiring for the walk-in seed cooler by installing surface-mounted conduit from the new subpanel to the cooler area, installing a service disconnect switch, and wiring the disconnect to the cooler's pre-wired control panel. Startup and testing of the cooler will be performed separately by an HVAC contractor provided by the owner. All removed materials shall be disposed of or recycled, and all work areas shall be cleaned. Work must be completed within 30 calendar days from contract award, and all materials and workmanship shall be warranted for one year from project completion. Location: Natural Resources Conservation Service (NRCS), Bridger Plant Materials Center, 98 South River Rd., Bridger, MT 59014-9718 The estimated value of this project is under $10,000. Any questions must be submitted in writing to Mark Domingo, Contract Specialist, at mark.domingo@usda.gov no later than February 23, 2026, 3:00pm ET.

Post-Bid

Military

$10,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 2, 2026

Project location map

98 S River Rd, Bridger, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.