BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2026 at 7:00 PM

Updated March 3, 2026

Site work and paving for a sidewalk / parking lot in St George, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Washington County Utah ("County") includes extensive lands managed by the State of Utah ("State"). The residents of and visitors to the County rely upon these lands for recreation. Recreation opportunities contribute to the high quality of life in the County by providing healthy activities as well as economic returns from tourism and related industries. These benefits compel the County to work in partnership with the State to create high-quality recreational trails on land managed by the State. b. This trail construction project will be part of a broader development involving the construction of a trailhead and event venue area. The event venue and trailhead will be constructed by others under a separate contract and not as part of the scope of work in this RFR The trailhead, event area, and trail system as a combination will be used primarily as a venue for state and national level races for the Utah High School Cycling League (UHSCL) and the National Interscholastic Cycling Association (NICA). The construction of the event venue area and trailhead facilities will commence in summer of 2026. c. Funds for the construction of the Desert Color Trail Construction: Phase 1 comes from County funds. Washington County Utah has secured a Federal grant, a state grant, and set aside County funds to complete approximately seven (7) miles of non-motorized natural surface singletrack trail at Desert Color Trail System for mountain bikers, adaptive mountain bikers, hikers, and trail runners. These trails will provide shared-use opportunities for the mentioned modalities, be used for trail-based events, provide trails for adaptive mountain bikers, and as mountain bike-optimized trails.

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

March 18, 2026

Project location map

E River Rd & E White Dome Dr, St George, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.