BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Galveston, Texas. Completed plans call for site work for a water / sewer project.

The City of Galveston is accepting sealed proposals for a contract for UTMB Elevated Storage Tank Rehabilitation. Sealed proposals should be uploaded to the Purchasing Division online portal for solicitation submittals. For additional information and to download the entire proposal package, visit the City of Galveston Purchasing Division's webpage. Any response received after the deadline will not be considered. Please follow the submittal instructions in the proposal package for electronic submittals and upload the entire response package to the specified website. The City of Galveston encourages participation from all Disadvantaged Business Enterprise (DBE) vendors, including all HUB, women, and minority-owned businesses. Question Deadline 03/17/2026 at 2:00 PM CT Online Work of the contract is for the rehabilitation of the 1.0 million gallon multi-leg elevated storage tank located at the corner of Harborside Dr. and North Holiday Dr, site improvements, and installation of a chloramine booster station. Work includes: 1. Demolition and removal of SCADA antenna and portions of the CMU wall, as indicated on the plans. 2. Blasting and recoating of the exterior and interior of the EST, including installation and removal of a containment shroud. 3. Structural and spot repair of steel. 4. Repair and reattachment of cable ties on the tank pedestal legs. 5. Installation of a dedicated 16" steel water line, valves, fittings, and appurtenances to fill the tank and installation of Tide-flex mixing valves. 6. Installation of a water service connection with RPZ. 7. Installation of a 11.3-foot by 18-foot concrete masonry unit (CMU) including lighting, ventilation, doors, and waterproofing membrane. 8. Installation of chloramine disinfection dosing system including analyzers, dosing units, booster pumps, chemical injectors, valves, piping, and appurtenances, and personal protection equipment required by TCEQ. 9. Removal and replacement of safety railings and 24" gooseneck vent 10. Rehabilitation of a 16-inch altitude control valve, installation of flow meter, gate valves, check valves, yard piping, and pipe thrust blocks. 11. Electrical: Power delivery for chloramine dosing system and analyzers, dosing pumps, relocation of SCADA equipment, removal of existing DFS antenna, installation of LED bowl lighting, and installation of Federal Aviation Administration (FAA) lighting on top of the tank. 12. Installation of driveway and bollards. Removal of curb and sidewalk. 13. Installation of brick capstones as shown on plans. 14. Chain link fence removal and replacement and installation of a cantilever sliding gate. 15. Traffic control plan implementation.

Post-Bid

Water / Sewer

$1,650,000.00

Public - City

Site Work

55

25

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
213
Bidding Soon
3,660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

June 15, 2026

Project location map

301 University Blvd, Galveston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.