Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work and new construction of a municipal facility in Pilot Point, Texas. Completed plans call for the construction of a municipal facility.
*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. This Work Package includes furnishing and constructing the Administration Building, including associated piping, site restoration, permitting, and startup services, in full accordance with the Contract Documents. Key Scope Elements: - Administration Building: Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance necessary for construction of the Administration Building. - Piping: Excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems. Provide all required trench safety plans, protective systems, equipment, and labor in accordance with applicable regulations and the Contract Documents. Piping systems include: Non-Potable Water (NPW): Lines 19A, 19B; Potable Water (PW): Line 20; Drain Line (DR): Line 17E. - Site Restoration: Restore all disturbed areas to match surrounding grades in accordance with the Contract Documents. - Permits & Inspections: Coordinate and obtain all required permits, certificates, and inspections in accordance with the Contract Documents and City of Pilot Point requirements. - Borrow Area: Utilize the Borrow Area for backfill or disposal of clean spoils, as permitted. - Startup & Testing: Provide complete startup, functional testing, commissioning, and operator training for all applicable systems, equipment, and structures in accordance with the project specifications. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via online.
Bid Results
Municipal
$79,281,915.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
July 6, 2026
N St James Rd, Pilot Point, TX
Related To This Project
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Feb 10 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
