BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Independence, Oregon. Completed plans call for site work for a water / sewer project.

This project was awarded to HP Civil in the amount of $13,070,593.72 Project Description Scope of Work: This project will install a new screened headworks, piping between lagoons, aeration in the lagoons to improve treatment and water quality, and upgrade the existing disinfection system. James W. Fowler Co. is requesting Quotes for the following Categories: Flagging Traffic Control Survey Demolition Site Clean Up Bio Solids Removal Concrete Supply Rebar Cast-In-Place Concrete Grouting Concrete Cutting & Boring Saw Cutting Structural Steel Framing Metal Fabrication Wood, Plastic, & Composite Rough Carpentry Waterproofing Thermal Insulation Roofing Metal Doors & Frames Overhead Coiling Door Gypsum Board Coating/Painting Signage Fire Suppression Metal Building Systems Plumbing HVAC Electrical Clearing & Grubbing Fill & Backfill Excavation Dewatering Erosion Control Aggregate Supply Curbs, Gutters, and Sidewalks Underground Utilities Instrumentation & Controls Mechanical (Process Integration) View More Project Additional Information No Information Provided Plan Room Try Takeoff for Free Search Files Original Documents0 SubFolders 8 Files x Project Description Scope of Work: This project will install a new screened headworks, piping between lagoons, aeration in the lagoons to improve treatment and water quality, and upgrade the existing disinfection system. James W. Fowler Co. is requesting Quotes for the following Categories: Flagging Traffic Control Survey Demolition Site Clean Up Bio Solids Removal Concrete Supply Rebar Cast-In-Place Concrete Grouting Concrete Cutting & Boring Saw Cutting Structural Steel Framing Metal Fabrication Wood, Plastic, & Composite Rough Carpentry Waterproofing Thermal Insulation Roofing Metal Doors & Frames Overhead Coiling Door Gypsum Board Coating/Painting Signage Fire Suppression Metal Building Systems Plumbing HVAC Electrical Clearing & Grubbing Fill & Backfill Excavation Dewatering Erosion Control Aggregate Supply Curbs, Gutters, and Sidewalks Underground Utilities Instrumentation & Controls Mechanical (Process Integration) The following range is a Project estimate for bonding purposes: $12,469,000 to $13,704,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Wastewater Treatment Plant Upgrades (Bid Package A): 1. Site civil improvements including: a. Demolition and selective demolition of existing structure(s), including pipe removal and abandonment in place b. Earthwork and grading c. Dewatering for concrete placement and pipe installation d. Complete yard piping installation e. Grading for roadways and other hard surfaces f. Coordination and installation of utility services 2. Installation of septage receiving pipeline (complete) 3. Construction of a new headworks structure (complete) 4. Construction of a new blower building with lagoon aeration (complete) 5. Construction of a new chemical storage building and leak detection vault (complete) 6. Installation of a new effluent flow meter with manhole (complete) 7. Installation of baffle wall(s) in lagoons 8. Construction of lagoon outlet structure(s) (complete) 9. Electrical, SCADA, and control system improvements 10. Temporary erosion and sediment controls, installation, maintenance, and removal upon permanent stabilization 11. All labor, Equipment, Materials, and incidentals necessary to complete the Work as specified. 9 th Street Pump Station Phases 2 & 3 (Bid Package B): 1. Site civil improvements including: a. Demolition and selective demolition of existing structure(s), including pipe removal and abandonment in place b. Earthwork and grading c. Dewatering for concrete placement and pipe installation d. Complete yard piping installation e. Grading for roadways and other hard surfaces f. Coordination and installation of utility services 2. Construction of a new precast wetwell (complete) 3. Electrical, SCADA, and control system improvements 4. Temporary erosion and sediment controls, installation, maintenance, and removal upon permanent stabilization. Also includes temporary water management and in-water work 5. All labor, Equipment, Materials, and incidentals necessary to complete the Work as specified. PN - ED24SEA0G0216

Award

Water / Sewer

$13,070,594.00

Public - City

Site Work

218

33

16

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
136
Bidding Soon
1,274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

May 12, 2026

Project location map

Multiple Locations, Independence, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.