BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Jim Thorpe, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project provides for the asphalt resurfacing of the Turnpike Northbound and Southbound lanes with Stone Matrix asphalt mixture and Reflective Crack Relief Asphalt Interlayer. The project also provides installation of Sonic Nap Alert Pattern (S.N.A.P) and pavement markings. Maintenance and protection of traffic is also included. Work items include, but are not limited to: 10,610 TON Reflective Crack Relief Asphalt Interlayer, Variable Depth 217 TON Reflective Crack Relief Asphalt Interlayer, Variable Depth, ORT 31,233 TON Stone Matrix Asphalt Mixture Design Wearing Course 651 TON Stone Matrix Asphalt Mixture Design Wearing Course, ORT 189,288 SY Milling of Asphalt Pavement Surface to Existing Concrete Pavement 3,944 SY Milling of Asphalt Pavement Surface to Existing Concrete Pavement, ORT 145,205 LF Standard Temporary Pavement Markings, Paint & Beads (White and Yellow) 154,327 LF Highly Reflectorized Polyurea Pavement Marking (White and Yellow) 3,297 LF Highly Reflectorized Polyurea Pavement Marking, Surface Applied, ORT (White and Yellow) 292 LF Black Epoxy Pavement Markings 4,490 LF Pavement Marking Removal 63,890 EA Sonic Nap Alert Pattern (S.N.A.P.) 1,692 EA Barrier Mounted Delineators - Top and Side Milepost A-95.17 is located approximately 0.17 miles north of the Pocono Interchange, Exit 95, and Milepost A-101.41 is located approximately 3.59 miles south of the Wilkes-Barre Interchange, Exit 105, in Carbon and Luzerne Counties, Pennsylvania. A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. Question Deadline 03/25/2026 at 12:00 PM ET Any questions for this project must be submitted electronically by registered business partners.

Bid Results

Roads / Highways

$5,935,935.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
389
Bidding Soon
4,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

June 1, 2026

Project location map

Multiple Locations, Jim Thorpe, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.