BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2026 at 7:00 PM

Updated March 10, 2026

Renovation of a multi-residential development in Mountain Village, Colorado. Completed plans call for the renovation of a multi-residential development.

The selected proposer shall remove and replace three non-condensing PK boilers with new, efficient, condensing boilers sufficient for melting 36,355 square feet of pavers. All piping, pumps, air separators, and expansion tanks shall be replaced as necessary. Piping must be insulated per code. All necessary electrical work associated with the boiler replacement is to be performed. Boiler controls are to be replaced with Tekmar 671. Coordination with the Heritage Crossing HOA is required to run new venting for intake and exhaust. A separate quote must be provided for flushing and replacing glycol in the entire system. All work must be completed by September 1, 2026. Deliverables include reports, design documents, construction documentation, and recommendations. Proposals must include a signed cover letter, firm/team qualifications and experience, project approach and methodology, proposed schedule and timeline, cost proposal/fee structure, at least three references (preferably municipal clients), and proof of insurance and licenses if applicable. Proposals must be submitted electronically in PDF format. Question Deadline 03/03/2026 at 12:00 PM MT All questions regarding this RFP must be submitted in writing via email to: Kyle Tanguay at ktanguay@mtnvillage.org

Post-Bid

Multi-Residential

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
17
Bidding Soon
112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

April 8, 2026

Project location map

To be determined, Mountain Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.