BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2026 at 8:00 PM

Updated March 28, 2026

Site work for a road / highway in Mountain Village, Colorado. Completed plans call for site work for a road / highway.

The Town of Mountain Village is soliciting proposals from qualified firms or individuals to provide the necessary materials, labor, specialized skills, and experience to paint all towers and designated terminal components on the gondola system. The intent is to identify and select a contractor or consultant best qualified to perform the required services in accordance with the specifications outlined. Question Deadline 03/03/2026 at 12:00 AM MT All questions regarding this RFP must be submitted in writing via email to: Conor Intemann at cintemann@mtnvillage.org SCOPE OF SERVICES The selected proposer shall be expected to perform the following tasks, including but not limited to: 1. Surface Preparation o Remove peeling or failed paint as required o Remove rust and corrosion from affected areas o Prime repaired areas prior to finish coating o Mask off galvanized crossarms and ladders to eliminate overspray Surface preparation shall be consistent with industry best practices for steel structural repainting in alpine environments. 2. Painting o Apply finish coating to all 38 - 30" gondola towers Tower Paint: Catylon 830, Gun Metal Gray Estimated Quantity: Approximately 70 gallons (contractor responsible for final quantity verification) o Paint terminal front masts o Paint terminal decks exposed to sunlight o Paint trumpet rails (paint system to be proposed by vendor to match existing) Proposers may recommend alternative systems provided they demonstrate equal or superior durability for high-elevation exposure. 3. Equipment & Access o Contractor shall provide all specialized equipment including but not limited to: o Snowmobiles, ATVs, High reach man lifts Town Responsibilities (for coordination purposes only): o Provide up to 20 hours of forklift assistance with operator o Provide truck access to the top gondola station no later than April 27, 2026 o Provide access to gondola "work chair" and operating personnel after May 2, 2026 foaccess to hard-to-reach towers o Provide climate-controlled storage space for contractor materials, accept delivery of supplies.

Award

Roads / Highways

$136,425.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
17
Bidding Soon
112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

April 6, 2026

Project location map

Multiple Locations, Mountain Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.