BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Limon, Colorado. Completed plans call for site work for a water / sewer project.

**As of April 21, 2026, this project has been awarded.** The work consists of wastewater collection system improvements, including mobilization and demobilization; development, approval, and operation of a traffic control plan and CDOT Utility Permit; replacement of various sizes of gravity sewer lines both below and above 8 feet of cover; installation of steel casing with gravity sewer carrier lines by bore, jack, and open trench; sewer service reconnections and installation; replacement, installation, and removal of manholes; utility crossing concrete supports; pavement and concrete removal and replacement; pavement paint markings; curb, gutter, and sidewalk concrete replacement; removal and disposal of concrete sewer cap; installation of riprap; non-irrigated grass seeding; stormwater management plan; along with all related appurtenances and incidentals of construction. Instructions to bidders include submitting a certified check, bank draft, negotiable U.S. Government bonds (at par value), or a satisfactory Bid Bond executed by the bidder and an acceptable surety for five percent (5%) of the total bid. Contractors must pay not less than the minimum salaries and wages as set in the contract documents and ensure non-discrimination in employment. Project funding is provided by the Colorado Department of Public Health and Environment's Water Pollution Control Revolving Fund and the Colorado Department of Local Affairs' Energy/Mineral Impact Assistance Fund, and bidders must comply with associated requirements such as Davis-Bacon wages and Build America Buy America iron and steel requirements. Hard copies of contract documents are available for purchase, and a partial refund is provided for returned hard copies in good condition within 30 days of bid opening; no refund for electronic sets. Question Deadline 03/20/2026 Submit all questions about the Drawings or Specifications to the Engineer in writing no later than five (5) days prior to the time set for receipt of bids. Corrections or clarifications shall be made by ADDENDUM. Oral clarifications will not be binding.

Award

Water / Sewer

$1,262,019.00

Public - City

Site Work

12

17

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
72
Bidding Soon
1,115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 25, 2026

Project location map

Multiple Locations, Limon, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.