Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Renovation of a detention facility in Limon, Colorado. Completed plans call for the renovation of a detention facility.
The Contractor shall perform field verification, provide equipment/engineering submittals, perform selective demolition, furnish and install all specified mechanical equipment, replace associated controls, and provide final electrical connections. The work includes but is not limited to rooftop fan replacement, furnace and condensing unit replacement, rooftop intake and relief hood replacement, insulation repair and replacement, and appurtenances. The Contractor shall coordinate state permitting and inspections, provide factory authorized start-up, testing, and commissioning. Work covered shall consist of furnishing all labor, equipment, supplies and materials in performing all operations necessary for the installation of complete and operational utility systems. The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project. The Architect/Engineer of Record for the above referenced project has prepared drawings and a project manual describing the scope of work to be performed for purposes of soliciting construction bids for the above referenced project. These documents have been issued to those parties formally requesting documents pursuant to the Invitation for Bids, or by attendance at the mandatory Pre-Bid Meeting (herein referred to as planholders). Due to the sensitive nature of the project, the Colorado Department of Corrections has required that all planholders be prohibited from reproducing the hard-copy bid document sets issued them in any form, including hard copies and electronic files. Anticipated Construction Start March 24, 2026 Anticipated Construction Finish June 24, 2026 Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule. All inquiries, questions, comments, or concerns should be submitted to robyn.ventura@state.co.us and andrew.s.harris@state.co.us. POINT OF CONTACT/CLARIFICATION Name: Andrew Harris Agency: Colorado Department of Corrections / Facility Management Services Phone: 719-756-2941 Address: 1250 Academy Park Loop, Colorado Springs, CO 80910 Email: andrew.s.harris@state.co.us If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. If a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor's bid. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.
Sub-Bidding
Jails / Prisons
$1,400,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2026
March 24, 2026
49030 CO-71, Limon, CO
Related To This Project
Limon, CO
Bid Date: Mar 04 2026
Limon, CO
Bid Date: Jan 09 2026
Limon, CO
Bid Date: Jun 04 2025
Limon, CO
Bid Date: Apr 17 2025
Limon, CO
Bid Date: Oct 25 2024
Limon, CO
Bid Date: Sep 04 2024
Limon, CO
Bid Date: May 14 2024
Limon, CO
Bid Date: Apr 09 2024
Limon, CO
Bid Date: Jan 11 2024
Limon, CO
Bid Date: Nov 29 2023
Limon, CO
Bid Date: Oct 12 2023
Limon, CO
Bid Date: Mar 30 2022
Limon, CO
Bid Date: May 06 2022
Limon, CO
Bid Date: Oct 11 2022
Colorado Springs, CO
Bid Date: Mar 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
