Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2026 at 7:00 PM

Updated March 11, 2026

Renovation of a stadium in Canton, Illinois. Completed plans call for the renovation of a stadium.

The work includes the replacement of the existing Stadium wood ADA ramp and landings, and the repair of the Stadium locker room south wall. All bidders must comply with applicable Illinois and United States laws, including but not limited to the Preference to Citizens (Illinois) on Public Works Projects Act and the Prevailing Wage Act. Bids must include a notarized certification that the contractor is not barred from bidding due to violations of Article 33E, Public Act 85-1295. Certification is included in the Proposal Form in the Project Manual. Bids must be accompanied by a bid bond amounting to 5% of the Base Bid, payable to the Board of Education, Canton Union School District #66, or they will be rejected. The successful bidder must provide a Surety Performance Bond and Payment Bond, each for 100% of the contract cost, with bonds to be issued on prescribed forms within ten days after notice of acceptance. The surety must be authorized and licensed to do business in Illinois and be U.S. Treasury backed, and the contractor must pay the bond premiums. The Board of Education reserves the right to reject any or all bids and to waive any irregularities in bidding. Bids may not be withdrawn for sixty days after opening.

Post-Bid

Arenas / Stadiums

$100,000.00

Public - City

Renovation

5

14

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
82
Bidding Soon
1,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

May 27, 2026

Project location map

1001 North Main Street, Canton, IL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed