Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a warehouse / distribution facility in Seward, Alaska. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Amendment 3: The purpose of this amendment is to provide the following: 1) Additional solicitation questions have been answered and added on the attached document titled C-3 QA 1240BJ26Q0003. 2) An updated drawing sheet C2.0 is attached titled C-2 Attachment 3-2 Updated Location and Drainage. 3) A geotechnical investigation is attached titled C-2 Attachment 8 Geotechnical Memo. Note: Seward Electric is supposed to have pricing available to move the electrical equipment prior to March 31st. Amendment 2: The purpose of this amendment is to extend the due date for quotes to 4/9/2026. The U.S. Forest Service is waiting for the design contractor to provide answers and possible updates, which is required because of solicitation questions. An additional amendment will be issued that will provide answers to all solicitation questions asked from interested parties. Amendment 1: The purpose of this amendment is to provide answers to solicitation questions. The attached document titled C-3 QA 1240BJ26Q0003 provides answers to the initial six questions received. Grading the existing storage yard area to improve stormwater drainage near the pole barn location, installing all required dry utilities to serve the new pole barn, and constructing the pole barn building in accordance with the construction plans and specifications. Optional work includes relocating Seward Electric's transformer as shown on the electrical drawings and installing the security fence and gates around the storage yard per the project specifications. The period of performance is from April 21, 2026, through November 30, 2027. Location: Kenai Lake Work Center Mile 24 Seward Highway Seward, AK 99664 Base Items: Pole Barn Building that includes: (1) grading the existing storage yard area for stormwater drainage improvements in the vicinity of the pole barn area; (2) Installation of all dry utilities to the new pole barn building; (3) and construction of the new pole barn building per the construction plans and specifications. Option Item - Relocation of Seward Electric's transformer as shown on Drawing E1.1 of the Pole Barn Plans. Option Item: Installing the security fence and gates around the storage yard per the construction plans and specifications. Questions concerning solicitation. Direct questions regarding this solicitation to Eric Oldenkamp via e-mail eric.oldenkamp@usda.gov.

Post-Bid

Warehouse / Distribution

$10,000,000.00

Public - Federal

New Construction, Site Work

28

22

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

April 21, 2026

Project location map

Mile 24 Seward Highway,, Seward, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.