Published April 17, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Spanish Fork, Utah. Completed plans call for the renovation of a educational facility.

Upgrade the existing HVAC system from a 2-pipe heating hot water and chilled water-cooling configuration to a 4-pipe heating hot water and chilled water-cooling system. The scope includes removing and replacing existing fan coils with new fan coils equipped with both heating hot water and chilled water coils, installing new chilled water distribution piping throughout the building, and reworking piping to fully separate the heating and cooling systems. Chiller pumps will be modified or replaced as required to support the new configuration. Upon completion, the heating hot water system, chilled water system, and fan coil airside will be fully balanced (the Project). Spanish Oaks School Project #2 - Westside School: Upgrade the existing HVAC system from a 2-pipe heating hot water and chilled water-cooling configuration to a 4-pipe heating hot water and chilled water-cooling system. The scope includes removing and replacing existing fan coils with new fan coils equipped with both heating hot water and chilled water coils, installing new chilled water distribution piping throughout the building, and reworking piping to fully separate the heating and cooling systems. Chiller pumps will be modified or replaced as required to support the new configuration. Upon completion, the heating hot water system, chilled water system, and fan coil airside will be fully balanced. Project #3 - Mt. Nebo Middle School: Upgrade from a 2-pipe glycol heating and evaporative cooling system to a 4-pipe heating hot water and chilled water-cooling system. The work includes installation of a new air-cooled chiller; replacement of existing heating fan coils with new fan coils equipped with heating hot water and chilled water coils; addition of chilled water coils to select existing fan coils; installation of new chilled water piping throughout the building; replacement of hot water valves, circuit setters, and associated components; installation of mini-split systems within administrative areas; relocation and reconfiguration of the existing gas meter into the building; and testing, adjusting, and balancing of the entire buildings air-side and hydronic systems, including systems being balanced for the first time where applicable. In addition, Contractor will be assessed a liquidated damage of One Hundred Dollars ($100) per calendar day for failure to timely complete punch list items. Bid Results : Spanish Oaks Elementary Western States Mechanical $1,236,270.00 Westside Elementary PHE $1,029,000.00 Mt Nebo Middle School Western States Mechanica $2,887,615.00

Bid Results

Educational

$5,152,885.00

Public - County

Renovation

132

34

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
96
Bidding Soon
1,217
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

March 15, 2026

Project location map

Multiple Locations, Spanish Fork, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.