Published April 17, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an educational facility in Spanish Fork, Utah. Completed plans call for the renovation of a educational facility.
Upgrade the existing HVAC system from a 2-pipe heating hot water and chilled water-cooling configuration to a 4-pipe heating hot water and chilled water-cooling system. The scope includes removing and replacing existing fan coils with new fan coils equipped with both heating hot water and chilled water coils, installing new chilled water distribution piping throughout the building, and reworking piping to fully separate the heating and cooling systems. Chiller pumps will be modified or replaced as required to support the new configuration. Upon completion, the heating hot water system, chilled water system, and fan coil airside will be fully balanced (the Project). Spanish Oaks School Project #2 - Westside School: Upgrade the existing HVAC system from a 2-pipe heating hot water and chilled water-cooling configuration to a 4-pipe heating hot water and chilled water-cooling system. The scope includes removing and replacing existing fan coils with new fan coils equipped with both heating hot water and chilled water coils, installing new chilled water distribution piping throughout the building, and reworking piping to fully separate the heating and cooling systems. Chiller pumps will be modified or replaced as required to support the new configuration. Upon completion, the heating hot water system, chilled water system, and fan coil airside will be fully balanced. Project #3 - Mt. Nebo Middle School: Upgrade from a 2-pipe glycol heating and evaporative cooling system to a 4-pipe heating hot water and chilled water-cooling system. The work includes installation of a new air-cooled chiller; replacement of existing heating fan coils with new fan coils equipped with heating hot water and chilled water coils; addition of chilled water coils to select existing fan coils; installation of new chilled water piping throughout the building; replacement of hot water valves, circuit setters, and associated components; installation of mini-split systems within administrative areas; relocation and reconfiguration of the existing gas meter into the building; and testing, adjusting, and balancing of the entire buildings air-side and hydronic systems, including systems being balanced for the first time where applicable. In addition, Contractor will be assessed a liquidated damage of One Hundred Dollars ($100) per calendar day for failure to timely complete punch list items. Bid Results : Spanish Oaks Elementary Western States Mechanical $1,236,270.00 Westside Elementary PHE $1,029,000.00 Mt Nebo Middle School Western States Mechanica $2,887,615.00
Bid Results
Educational
$5,152,885.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.