BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a transportation facility in Manteo, North Carolina. Completed plans call for the construction of a 3,900-square-foot transportation facility; and 5,400-square-foot, three-room transportation facility.

The project consists of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the Hangars and Taxilanes project. Items of work include erosion control, pavement removal, earthwork, drainage, bituminous pavement construction, concrete pavement construction, and construction of a new box hangar (approximately 60' x 65' - Schedule I North Site) and a new 3-unit hangar (approximately 45'x40' each unit - Schedule II South Site). Instructions to bidders include: Bidders must submit sealed bids accompanied by a Bid Bond, a deposit of cash or by a certified check payable to Dare County Airport Authority for an amount equal to 5% of the total base bid. Each bidder must be registered as a prequalified bidder with the NCDOT at the time of bid opening. All subcontractors should be registered as pre-qualified subcontractors with the NCDOT at the beginning of the project. The proposed contract is subject to the Federal Contract Provision Requirements. Prospective bidders should carefully read the instructions for preparing bids in Section 20 of the project specifications before submitting their bids. Envelopes containing proposals must be sealed, addressed to Stacy Ambrose, Airport Director, Dare County Regional Airport, and marked on the envelope as specified. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. Federal Contract Provisions are included, and the contract award is contingent upon the availability of Federal, State, and Local funds. The Dare County Airport Authority reserves the right to reject any or all proposals. Bid Result Schedule I (North Site Base Bid ) - A.R. Chesson Construction - 1,074,246 Schedule II (South Site Base Bid ) - A.R. Chesson Construction - 1,149,613

Bid Results

Transportation Terminals

$2,223,859.00

Public - County

New Construction, Site Work

33

20

21

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2026

May 25, 2026

Project location map

410 Airport Rd, Manteo, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.