Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a development in Hastings, Nebraska. Completed plans call for site work for a development.
Hydrogeologic investigation including soil borings, monitoring well installation and methane monitoring probe installation for Hastings Landfill North Expansion in Hastings, Nebraska. If you plan on bidding and are not already on the approved bidders list for this project, you are required to fill out the Plan Holders Submittal Form that is located on the City website. Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bids received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project. The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. TECHNICAL QUESTIONS Lee Vrooman Director of Engineering 1228 N Denver Ave Hastings, NE 68901 Ph# 402-462-3657 Email: bidquestions@cityofhastings.org GENERAL QUESTIONS OR REQUESTS Renae Griess Engineering Admin Assistant Ph# 402-462-3665 Email: bidquestions@cityofhastings.org Intent of Plans and Specifications. The intent of the plans and specifications is to provide for the construction and completion of every detail of the work described therein. It shall be understood by the Contractor that he will furnish all labor, materials if applicable, tools, transportation, and supplies required for all or any part of the work to make each item complete in accordance with the spirit of the contract. It is understood that the apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that only the best general practice is to prevail, and that only materials and workmanship of the best quality are to be used. For the purpose of design and the preparation of the Engineer's estimate, the City may perform a reasonable amount of exploratory work to gain information relative to surface and subsurface conditions relating to types of soil, moisture content and types and extent of rock strata. This information, when shown on the plan, represents to the best of the City's knowledge, conditions as of the date the survey was made. The appearance of this information on the plan will not constitute a guarantee that conditions other than those indicated will not be encountered at the time of construction. The bidder may utilize this information as he sees fit. Any bidder interested in the work is authorized to make whatever additional investigation he considers advisable. he City of Hastings has begun preliminary locational criteria activities for the permitting process of a proposed expansion at the Hastings Adams County Municipal Solid Waste Landfill (Site). The existing facility is permitted under Nebraska Department of Water, Energy, and Environment’s (NDWEE’s) Title 132 – Integrated Solid Waste Management Regulations (Title 132) for disposal of municipal solid waste (Permit No. NE0055140). The proposed northern expansion area relative to the existing, constructed landfill facilities are depicted on the Figure 1 - Hydrogeologic Investigation Site Map (Attachment A – 1). Soil and hydrogeological investigations are required for evaluating a property for potential landfill development or expansion. Information obtained from these investigations are necessary for evaluating locational criteria, landfill cell design, and development of the hydrologic monitoring system plan. This workplan outlines the proposed services for the soil and hydrogeological investigations to evalua
Award
Conservation and Development
$65,227.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
