Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Fort Defiance, Arizona. Completed plans call for site work for a water / sewer project.
Questions Due to NTUA February 26, 2026 by 5:00 p.m. (MST) Award Contract/Notice to Proceed March 19, 2026 COmpletion- July 31, 2026 SCOPE: The work consists of three main tasks: A. Procurement and setting the well pump, drop pipe, and appurtenances. B. Installation of the pitless adapter unit. C. Complete wellhead as specified. Tsaile Well No. 9 is targeted to produce 150 gallons per minute with a total dynamic head (TDH) of up to 400 feet. These conditions are based on a best-case scenario for water availability and a worst-case scenario for total dynamic head. Tables detailing well design and construction information are also shown on the Construction Drawings. A two-room pumphouse shall be constructed in accordance with the Construction Drawings and specifications. Concrete and mortar shall meet the requirements as set forth in TP-02. The work shall include all labor and equipment necessary to perform the excavation, backfilling, grading, construction of footings, slab, and structure, plumbing tree installation, completion of functioning electrical and supervisory control and data acquisition (SCADA) system, and waste drain line for the treatment building, final cleanup, and start-up operations including painting and pipe connection (outside the building). Inquiries: If there are any questions, firms Andrea Hale, Contract Administrator, via email andreah@ntua.com. NTUA will only respond to questions related to this RFP prior to the date indicated above. All emails should have " NTUA PUMPHOUSE CONSTRUCTION FOR TSAILE NO. 3 - QUESTIONS" in the subject line. All questions and answers will be published for all interested parties so do not include confidential information in the submitted questions. Informalities Proposals: NTUA reserves the right to reject any or all proposals and to waive informalities in the proposals received, including (without limitation) waiving the deadline for proposals, whenever such rejection or waiver is in the best interest of NTUA. NTUA reserves the right to reject any proposal based on deficient past performance, including projects conducted with NTUA, other Navajo Nation agencies, the federal, state, or local governments, or any commercial project. NTUA Tsaile Well No. 9 Pumphouse Construction Scope of Work Contractor shall construct a two-room pumphouse in accordance with the geotechnical report and sealed construction drawings and specifications. The work shall include all labor and equipment necessary to perform the excavation, backfilling, site grading, construction of footings, slab, and structure, plumbing tree installation, gas chlorination system, completion of functioning electrical and supervisory control and data acquisition (SCADA) system, waste drain line for the treatment building, rod iron ornamental security fence and gate, final cleanup, and start-up operations including painting and pipe connection. The contractor is responsible for procuring all items related to well construction. The NTUA will be responsible for well construction and extension of power to the site.
Post-Bid
Water / Sewer
$500,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
