Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Fort Defiance, Arizona. Completed plans call for site work for a water / sewer project.

The work consists of three main tasks A. Procurement and setting the well pump, drop pipe, and appurtenances. B. Installation of the pitless adapter unit. C. Complete wellhead as specified. Kayenta Well #9 is targeted to produce 125 gallons per minute with a total dynamic head (TDH) of up to 950 feet. These conditions are based on a best-case scenario for water availability and a worst-case scenario for total dynamic head. Tables detailing well design and construction information are also shown on the Construction Drawings. Questions Due to NTUA February 26, 2026 by 5:00 p.m. (MS Award Contract/Notice to Proceed March 19, 2026 Inquiries: If there are any questions, firms Andrea Hale, Contract Administrator, via email andreah@ntua.com. NTUA will only respond to questions related to this RFP prior to the date indicated above. All emails should have " NTUA PUMPHOUSE CONSTRUCTION - QUESTIONS" in the subject line. All questions and answers will be published for all interested parties so do not include confidential information in the submitted questions. NTUA reserves the right to reject any or all proposals and to waive informalities in the proposals received, including (without limitation) waiving the deadline for proposals, whenever such rejection or waiver is in the best interest of NTUA. NTUA reserves the right to reject any proposal based on deficient past performance, including projects conducted with NTUA, other Navajo Nation agencies, the federal, state, or local governments, or any commercial project. NTUA Kayenta No. 9 Pumphouse Construction Scope of Work Contractor shall construct a two-room pumphouse in accordance with the geotechnical report and sealed construction drawings and specifications. The work shall include all labor and equipment necessary to perform the excavation, backfilling, site grading, construction of footings, slab, and structure, plumbing tree installation, gas chlorination system, completion of functioning electrical and supervisory control and data acquisition (SCADA) system, waste drain line for the treatment building, rod iron ornamental security fence and gate, final cleanup, and start-up operations including painting and pipe connection. The contractor is responsible for procuring all items related to well construction. The NTUA will be responsible for well construction and extension of power to the site. Question Deadline 02/26/2026 at 5:00 PM MT If there are any questions, firms Andrea Hale, Contract Administrator, via email andreah@ntua.com.

Post-Bid

Water / Sewer

$910,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
14
Bidding Soon
127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 7, 2026

Project location map

To Be Determined, Fort Defiance, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.