Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 25, 2026 at 8:00 PM
Updated September 10, 2026
Demolition, site work, renovation and addition to an educational facility in Grand Junction, Colorado. Completed plans call for the addition of a 76,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
https://www.kjct8.com/2026/05/22/central-high-school-celebrates-groundbreaking-major-renovation-project/ GRAND JUNCTION, Colo. (KJCT) -Renovation construction for District 51’s oldest school building officially broke ground. Grand Junction’s Central High School held a ceremony Thursday morning to celebrate the school’s newest milestone, which the school said will usher in renovations that will uphold a “safe, modern, and future-focused learning environment for students.” “Ground break is an exciting opportunity for not only our students but our community,” said Central High School Principal Zeb Hayward on the ceremony. “I think the investment in our school and our students is even more compounded in this event today.” The renovations are part of a 2024 bond initiative passed by voters— which the school said will be used for significant upgrades to the campus, improved learning spaces, enhanced safety and security features and modernized facilities that will better support students and facility for the future. “This is something that’s been long in the process,” Hayward said. “To be able to actually see the work— something tangible in our dollars is, I think, really impactful to our community.” “Having our parents trust to send their kids to school on a day-to-day basis, we need to be able to make sure that we’re stewards of that,” Hayward continued. “That we’re really caring for their kids. And to be able to do so with this new building is going to be pretty important.” The project, Hayward said, would not have been possible without community support, staff, construction teams and most important of all: the students. “It’s just been amazing to be a part of that so far, and I’m really excited to see where the next two years takes us,” Hayward said. ------------------------------------------------------------------------- Bid Package #2 of the Central High School Additions & Renovations project located in Grand Junction, Colorado. General Project Description: FCI Constructors, Inc. has been contracted by Mesa County Valley School District 51 as Construction Manager / General Contractor for the Central High School project located in Grand Junction, CO. The project scope includes 65,000 SF of new construction/addition and 11,000 SF of renovation on the existing school campus. Currently, construction is scheduled to begin in March 2026 (for scopes procured in Bid Package #1), with a total project substantial completion date of December 2028, with several phase substantial completion dates; see the Master Schedule for phases. See attached construction schedule for specific timeframes as they relate to each trade. Bidders are instructed to include the necessary resources to perform their scope(s) within the scheduled timeframes and include cost escalation on all labor, materials, and equipment in accordance with the schedule. Summary Project Description: The existing Central High School will be renovated and added onto. The existing school facilities will remain in use throughout the construction project.. B. Contract Scope: Construction, demolition, renovation, and construction phasing. C. Contract Terms: Cost plus a fee, with a guaranteed maximum price (GMP).
Post-Bid
Educational
$60,000,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
June 1, 2026
550 Warrior Way, Grand Junction, CO
Related To This Project
Grand Junction, CO
--
Grand Junction, CO
Bid Date: Mar 13 2026
Grand Junction, CO
Bid Date: Mar 06 2026
Grand Junction, CO
--
Grand Junction, CO
--
Grand Junction, CO
--
Grand Junction, CO
--
Grand Junction, CO
Bid Date: Mar 20 2026
Grand Junction, CO
Bid Date: Mar 20 2026
Grand Junction, CO
Bid Date: Mar 19 2026
Grand Junction, CO
Bid Date: Mar 12 2026
Grand Junction, CO
--
Grand Junction, CO
Bid Date: Mar 05 2026
Grand Junction, CO
Bid Date: Mar 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
