BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 25, 2026 at 8:00 PM

Updated September 10, 2026

Demolition, site work, renovation and addition to an educational facility in Grand Junction, Colorado. Completed plans call for the addition of a 76,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

https://www.kjct8.com/2026/05/22/central-high-school-celebrates-groundbreaking-major-renovation-project/ GRAND JUNCTION, Colo. (KJCT) -Renovation construction for District 51’s oldest school building officially broke ground. Grand Junction’s Central High School held a ceremony Thursday morning to celebrate the school’s newest milestone, which the school said will usher in renovations that will uphold a “safe, modern, and future-focused learning environment for students.” “Ground break is an exciting opportunity for not only our students but our community,” said Central High School Principal Zeb Hayward on the ceremony. “I think the investment in our school and our students is even more compounded in this event today.” The renovations are part of a 2024 bond initiative passed by voters— which the school said will be used for significant upgrades to the campus, improved learning spaces, enhanced safety and security features and modernized facilities that will better support students and facility for the future. “This is something that’s been long in the process,” Hayward said. “To be able to actually see the work— something tangible in our dollars is, I think, really impactful to our community.” “Having our parents trust to send their kids to school on a day-to-day basis, we need to be able to make sure that we’re stewards of that,” Hayward continued. “That we’re really caring for their kids. And to be able to do so with this new building is going to be pretty important.” The project, Hayward said, would not have been possible without community support, staff, construction teams and most important of all: the students. “It’s just been amazing to be a part of that so far, and I’m really excited to see where the next two years takes us,” Hayward said. ------------------------------------------------------------------------- Bid Package #2 of the Central High School Additions & Renovations project located in Grand Junction, Colorado. General Project Description: FCI Constructors, Inc. has been contracted by Mesa County Valley School District 51 as Construction Manager / General Contractor for the Central High School project located in Grand Junction, CO. The project scope includes 65,000 SF of new construction/addition and 11,000 SF of renovation on the existing school campus. Currently, construction is scheduled to begin in March 2026 (for scopes procured in Bid Package #1), with a total project substantial completion date of December 2028, with several phase substantial completion dates; see the Master Schedule for phases. See attached construction schedule for specific timeframes as they relate to each trade. Bidders are instructed to include the necessary resources to perform their scope(s) within the scheduled timeframes and include cost escalation on all labor, materials, and equipment in accordance with the schedule. Summary Project Description: The existing Central High School will be renovated and added onto. The existing school facilities will remain in use throughout the construction project.. B. Contract Scope: Construction, demolition, renovation, and construction phasing. C. Contract Terms: Cost plus a fee, with a guaranteed maximum price (GMP).

Post-Bid

Educational

$60,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

413

35

214

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
17
Bidding Soon
169
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

June 1, 2026

Project location map

550 Warrior Way, Grand Junction, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.