BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2026 at 8:00 PM

Updated March 31, 2026

Site work, paving and outdoor lighting for a mixed-use development in West Palm Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; for outdoor lighting for a road / highway; and water / sewer project.

Financial Project ID: 438386-5-52-01, 438386-5-52-02 & 438386-5-52-03 Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic officer, low-profile barrier, ped LCD, arrow board, PCMS, signalization, traffic detection, barricade), inlet protection, monitor structures (inspection, settlement), clearing/grubbing (standard, selective), earthwork (excavation, embankment), asphalt (stabilization, base, milling, resurfacing), concrete (traffic separator, sidewalk, driveways), handrail/guiderail, signing (single-column, multi-column remove, sign strip, object marker, tubular delineator, panel, panel remove, illuminated F&I, illuminated relocate, enhanced), pavement markings (detectable, painted, thermoplastic, bike lane), pavers, conduit, pull/splice box, lighting (conductors, luminaire, cable distribution), signalization (signal cable, fiber optic, communication cable, prestressed pole, aluminum pole, steel mast arm, vehicular signal, vehicle detection, ped signal, ped detection, priority/preemption, controller, cabinet), ITS (CCTV camera), field ethernet, drainage (inlets, manholes, yard drain, pipe culvert, curb/gutter), electrical service (power, wire, wire remove), traffic monitoring site (sensor, loop, cabinet), utility adjustments (manhole, valve box), landscaping (mulch, tree protection, tree removal, tree/palm relocate, root/branch pruning), and sod along State Road 5 (US-1) from Camino Real to NE 8th Street/Mizner Boulevard for 1.284 miles in the City of Boca Raton, Palm Beach County. Total Roadway Length: 1.284 Miles Contract Days: 342 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.284 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Days Question Deadline 03/18/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. FDOT - 023 - Resurfacing / Drainage / Sidewalk - State Road 5 (US-1)

Bid Results

Roads / Highways

$6,362,382.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

260

6

5

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
11
Bidding Soon
1,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2026

May 25, 2026

Project location map

FL-5, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.