Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a bridge / tunnel in Fullerton, California. Completed plans call for paving for a bridge / tunnel; and for site work for a bridge / tunnel.
In general, the work consists of constructing a pedestrian bridge spanning a key campus crossing at Nutwood and Commonwealth avenues to protect pedestrians and reduce accidents, mitigate neighborhood concerns and improve traffic flow, as well as reduce vehicle trips and encourage walking and biking. The project includes a new pedestrian bridge structure, placement of retaining walls on CSUF property for approach ramps, cast-in-place abutments founded on pile caps with cast-in-drilled-hole piles, and a new prefabricated single span truss over Nutwood Avenue. Modifications to medians and striping for the College Park building's north parking lot are required to accommodate the bridge structure and fire lane improvements. The work also includes removal and replacement of City of Fullerton traffic signals at the intersection of Nutwood Avenue and Commonwealth Avenue, new landscaping and lighting for the bridge structure and intersection, excavation and backfill for structures, traffic control, and sidewalk repairs for traffic signal relocation. This new bridge is funded by Federal, State (Caltrans), CSUF and County funds and will be located on Nutwood Avenue in Fullerton, CA. Please allow sufficient time for parking and arrival at the conference room as late arrivals will not be admitted. It will be the responsibility of each bidder to obtain an official bid proposal package in sufficient time to fulfill requirements therein. Bid proposal packages are obtainable only by prequalified contractors attending the mandatory Pre-Bid conference, licensed in the State of California with a "A" license, and registered with the DIR to bid public works projects. Official bid packages must be requested from the Trustees, located at California State University, Fullerton, 2600 Nutwood Avenue, Suite 300, Fullerton, CA 92831; Attention: Sally Yassine, E: syassine@fullerton.edu or T: (657) 278-5492 Question Deadline 04/07/2026 at 5:00 PM PT
Bid Results
Bridges / Tunnels
$11,400,794.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
June 22, 2026
Nutwood Ave, Fullerton, CA
Related To This Project
Fullerton, CA
Bid Date: Mar 18 2026
Fullerton, CA
Bid Date: Mar 18 2026
Fullerton, CA
Bid Date: Mar 25 2026
Fullerton, CA
Bid Date: Mar 26 2026
Fullerton, CA
--
Fullerton, CA
Bid Date: Jun 09 2026
Fullerton, CA
Bid Date: May 12 2026
Fullerton, CA
Bid Date: Mar 27 2026
Fullerton, CA
Bid Date: Feb 26 2026
Fullerton, CA
Bid Date: Feb 12 2026
Fullerton, CA
Bid Date: Feb 23 2026
Fullerton, CA
Bid Date: Jan 29 2026
Fullerton, CA
Bid Date: Jan 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
