BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a bridge / tunnel in Fullerton, California. Completed plans call for paving for a bridge / tunnel; and for site work for a bridge / tunnel.

In general, the work consists of constructing a pedestrian bridge spanning a key campus crossing at Nutwood and Commonwealth avenues to protect pedestrians and reduce accidents, mitigate neighborhood concerns and improve traffic flow, as well as reduce vehicle trips and encourage walking and biking. The project includes a new pedestrian bridge structure, placement of retaining walls on CSUF property for approach ramps, cast-in-place abutments founded on pile caps with cast-in-drilled-hole piles, and a new prefabricated single span truss over Nutwood Avenue. Modifications to medians and striping for the College Park building's north parking lot are required to accommodate the bridge structure and fire lane improvements. The work also includes removal and replacement of City of Fullerton traffic signals at the intersection of Nutwood Avenue and Commonwealth Avenue, new landscaping and lighting for the bridge structure and intersection, excavation and backfill for structures, traffic control, and sidewalk repairs for traffic signal relocation. This new bridge is funded by Federal, State (Caltrans), CSUF and County funds and will be located on Nutwood Avenue in Fullerton, CA. Please allow sufficient time for parking and arrival at the conference room as late arrivals will not be admitted. It will be the responsibility of each bidder to obtain an official bid proposal package in sufficient time to fulfill requirements therein. Bid proposal packages are obtainable only by prequalified contractors attending the mandatory Pre-Bid conference, licensed in the State of California with a "A" license, and registered with the DIR to bid public works projects. Official bid packages must be requested from the Trustees, located at California State University, Fullerton, 2600 Nutwood Avenue, Suite 300, Fullerton, CA 92831; Attention: Sally Yassine, E: syassine@fullerton.edu or T: (657) 278-5492 Question Deadline 04/07/2026 at 5:00 PM PT

Bid Results

Bridges / Tunnels

$11,400,794.00

Public - State/Provincial

Paving, Site Work

90

26

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
620
Active Projects
282
Bidding Soon
4,354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 22, 2026

Project location map

Nutwood Ave, Fullerton, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.