BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Demolition, site work, paving and new construction of a civil project in Saltsburg, Pennsylvania. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Initiating Organization: Engineering District 8-0 Agreement Type: Open End 100% State Funded: No Services Requested: Design and Misc Services The scope of this project is for the full replacement of the structure that carries SR 286 over Kiskiminetas River (First Sergeant Alexander Kelly Memorial Bridge) in Saltsburg Borough, Indiana County. BMS # 32-0286-0010-0000 The selected engineering Consultant will be required to perform all tasks and activities necessary to complete Preliminary Engineering, Final Design, and Construction Consultation. The Preliminary Engineering tasks and activities will include but not be limited to: field surveys, utility coordination, design criteria report, line and grade submission, TS&L, H&H Report, preliminary traffic control plan, 90% right of way plan, public involvement, design field view, constructability and safety reviews, E&S Plan, preliminary drainage and stormwater design, environmental clearance, subsurface explorations, and other Preliminary Engineering tasks as required. Final Design tasks and activities will include but not be limited to: field surveys, structure foundation report, roadway plans, utility coordination, final right of way plan, final structure plan and supporting calculations, construction CPM development, constructability and safety reviews, preparation of PS&E package, subsurface utility investigations if required, final traffic control plan, permitting, and other Final Design tasks as required. Construction Consultation tasks and activities will include but not be limited to: shop drawing reviews, attendance at pre-job meeting, survey, review of construction submissions, review of any alternate designs and addressing all RFI's from the Contractor, and other Construction Consultation tasks as required. The method of contractor selection has not been determined at this time. PADOT - RFQ Engineering - First Sergeant Alexander Kelly Memorial Bridge

Conceptual

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

Project location map

PA-286, Saltsburg, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.