BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2026 at 8:00 PM

Updated April 3, 2026

Site work and paving for a road / highway in Birchwood, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sealed bids are requested for the Orchard Avenue Extension project. The work includes excavation, grading, gravel roadway (approximately 1,300 linear feet), ditching, culverts, turf restoration, clearing, and erosion control. All work eligible for TID must be completed by August 1, 2026; the final project completion is required by September 1, 2026. Bid submissions must include itemized or lump-sum pricing, a proposed construction schedule, a list of subcontractors (if any), proof of insurance, a project manager contact, and confirmation of meeting deadlines. Project No - R00525051

Award

Roads / Highways

$161,248.00

Public - City

Paving, Site Work

15

14

16

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 22, 2026

Project location map

STH 48 Village of BIRCHWOOD, Birchwood, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.