Site work and new construction of a power facility in Prineville, Oregon. Completed plans call for the construction of a power facility; and for site work for a power facility.
This procurement consists of the design and installation of a 1,000 kilowatt (1000 kW AC) floating solar array on OID's small reservoir near Prineville, Oregon. Work under this contract shall commence no later than June 1, 2026, including final design and procurement of all materials, and appurtenances. The Owner reserves the right to waive any informality or to reject any or all bids in accordance with ORS 279B.100. Any bidder may withdraw its bid prior to the time of bid opening and no bidder may withdraw its bid after the time of bid opening. Award of any contract under this procurement is subject to OID Local Contract Review Board approval. Question Deadline Mar 20, 2026 Deadline for Contractors to Submit Questions This Request for Proposals (RFP) is to solicit bids from photovoltaic (PV) system installers (Contractor) to design, supply and install one photovoltaic system for OID. This project is part of the Oregon Community Solar Program. The project is located within the Pacific Power utility service territory. OID Community Solar Project Description Ochoco Irrigation District desires to build and operate a floating photovoltaic power generation system on a re-regulation pond located near Prineville, Oregon. _ The system should maximize output not to exceed 1000 kW AC in size. _ The project is registered through the Oregon Community Solar Program with Bonneville Environmental Foundation (BEF) as the registered Project Manager (PM). _ The project is located in Pacific Power utility service territory, and the PV system will be grid intertied into an existing kVA distribution line that runs along the edge of the property. Pacific Power has completed an interconnection study for the project. The results of the study are included in Exhibits.
Post-Bid
Solar Power Generation
$580,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2026
June 1, 2026
To Be Determined, Prineville, OR
Related To This Project
Prineville, OR
Bid Date: Mar 31 2026
Prineville, OR
Bid Date: Mar 31 2026
Prineville, OR
Bid Date: Mar 25 2026
Prineville, OR
Bid Date: Apr 22 2026
Prineville, OR
Bid Date: Mar 17 2026
Prineville, OR
Bid Date: Mar 24 2026
Prineville, OR
Bid Date: Mar 10 2026
Prineville, OR
Bid Date: Feb 24 2026
Prineville, OR
Bid Date: Jan 20 2026
Prineville, OR
Bid Date: Sep 25 2025
Prineville, OR
Bid Date: Sep 11 2025
Prineville, OR
Bid Date: Aug 19 2025
Prineville, OR
Bid Date: Aug 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.