Site work and new construction of a power facility in Prineville, Oregon. Completed plans call for the construction of a power facility; and for site work for a power facility.

This procurement consists of the design and installation of a 1,000 kilowatt (1000 kW AC) floating solar array on OID's small reservoir near Prineville, Oregon. Work under this contract shall commence no later than June 1, 2026, including final design and procurement of all materials, and appurtenances. The Owner reserves the right to waive any informality or to reject any or all bids in accordance with ORS 279B.100. Any bidder may withdraw its bid prior to the time of bid opening and no bidder may withdraw its bid after the time of bid opening. Award of any contract under this procurement is subject to OID Local Contract Review Board approval. Question Deadline Mar 20, 2026 Deadline for Contractors to Submit Questions This Request for Proposals (RFP) is to solicit bids from photovoltaic (PV) system installers (Contractor) to design, supply and install one photovoltaic system for OID. This project is part of the Oregon Community Solar Program. The project is located within the Pacific Power utility service territory. OID Community Solar Project Description Ochoco Irrigation District desires to build and operate a floating photovoltaic power generation system on a re-regulation pond located near Prineville, Oregon. _ The system should maximize output not to exceed 1000 kW AC in size. _ The project is registered through the Oregon Community Solar Program with Bonneville Environmental Foundation (BEF) as the registered Project Manager (PM). _ The project is located in Pacific Power utility service territory, and the PV system will be grid intertied into an existing kVA distribution line that runs along the edge of the property. Pacific Power has completed an interconnection study for the project. The results of the study are included in Exhibits.

Post-Bid

Solar Power Generation

$580,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
8
Bidding Soon
109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

June 1, 2026

Project location map

To Be Determined, Prineville, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.