BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2026 at 8:00 PM

Updated June 10, 2026

Site work and environmental remediation for a civil project in Jackson, Mississippi. Conceptual plans call for site work for a water / sewer project; and for environmental remediation for a water / sewer project.

The U.S. Army Corps of Engineers has approved a flood control project for the Pearl River in the Jackson, Mississippi area, selecting a design based on Alternative D1 involving widening the river within existing levees and constructing a weir south of Interstate 20 to reduce flood risks for homes and businesses in Hinds and Rankin counties. As of June 4, 2026, information regarding design firm and general contractor has not been released. Further details regarding construction and completion timelines have not been identified.

Conceptual

Water / Sewer

$450,000,000.00

Public - Federal

Environmental Remediation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2027

Project location map

I-20, Jackson, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.