Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 2, 2026 at 7:00 PM
Updated March 3, 2026
Site work and paving for a mixed-use development in Tiverton, Rhode Island. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Mount Hope Bay Greenway (MHBG) is a two and a half mile segment of a six mile shared use trail along the eastern shoreline of Mount Hope Bay within the unused railway ROW starting at the Sakonnet River Bridge in Tiverton RI and extending to the South Coast Rail commuter station in Fall River, MA. The construction is planned to be a coordinated effort between RIDOT to the Stateline and MassDOT to the new commuter rail station. The MHBG will connect Tiverton directly to Fall River bus service, a ferry line, and commuter rail service, making it not only a topnotch safe greenspace recreation trail, but also improve coastal access and fundamentally change the transportation options for Tiverton residents for access to job opportunities in a cost effective manner. County : Tiverton As of March 03, 2026, the project is in Conceptual status. Anticipated letting Year is 2029. RIDOT- Mount Hope Bay Greenway *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$40,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2029
Multiple Locations, Tiverton, RI
Related To This Project
Tiverton, RI
Bid Date: Mar 19 2026
Tiverton, RI
Bid Date: Mar 17 2026
Tiverton, RI
--
Tiverton, RI
Bid Date: May 20 2026
Tiverton, RI
Bid Date: Jun 02 2026
Tiverton, RI
Bid Date: May 12 2026
Tiverton, RI
Bid Date: Jun 12 2026
Tiverton, RI
--
Tiverton, RI
Bid Date: Feb 13 2026
Tiverton, RI
Bid Date: Jan 07 2026
Tiverton, RI
Bid Date: Jan 07 2026
Tiverton, RI
Bid Date: Nov 12 2025
Tiverton, RI
Bid Date: Oct 22 2025
Tiverton, RI
Bid Date: Nov 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
