BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Lake Oswego, Oregon. Completed plans call for site work for a 2,320-square-foot water / sewer project; and 2,320-square-foot sidewalk / parking lot.

The Contractor shall provide and install approximately 1,500 linear feet of new 6-foot wide sidewalk and approximately 2,320 square feet in plan area of stormwater management facilities (infiltration ditches) along McEwan Road's north shoulder, starting at SW Kristi Way (north intersection) and ending at SW 65th Avenue. Further to the east, the Contractor shall provide and install one new storm system catch basin, two new storm system manholes, a storm drain pipe, and a new tie-in connection to an existing storm system drywell. The Contractor will also be required to prepare and submit a Traffic Control Plan and Permit Application, initiate the Traffic Control Plan setup and takedown, and perform necessary clearing and grubbing of the project site in preparation for construction. Additionally, the Contractor shall provide and install tree protection measures and permanent and temporary erosion control, perform tree elevation lift pruning, and remove four trees located within and adjacent to the project site. The project site area is located between the existing edge of asphalt pavement and the public right-of-way/private property boundary. Refer to the Contract Documents for identified Project Work items and anticipated on-site construction activities. Project Substantial Completion shall be no later than August 25, 2026, and Project Final Completion shall be no later than September 24, 2026. It is the Contractor's responsibility to verify existing and future conditions associated with the work prior to submitting a bid. Any items not included at the time of bid, but required for successful project completion, shall become the Contractor's responsibility during both the tendering and construction phases. Bids shall be submitted by electronic means only and must be received up to the Bid Closing Time. Bidders must submit a Bid Security to the City, along with their Bid, in an amount of 10%. This project is subject to Oregon minimum wage rate requirements and Federal minimum wage rate requirements of the David-Bacon Act. Questions about the meaning or intent of the Bid Documents shall be submitted through the project bid site no later than seven days prior to Bid Closing Time. Clarifications to the Bidding Documents will be made by addenda only. Oral statements may not be relied upon and will not be binding or legally effective.

Bid Results

Sidewalks / Parking Lot

$930,000.00

Public - City

Paving, Site Work

49

13

32

8

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
113
Bidding Soon
1,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 4, 2026

Project location map

McEwan Road north shoulder from SW Kristi Way to SW 65th Avenue, Lake Oswego, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.