BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2026 at 8:00 PM

Updated March 31, 2026

Site work for a water / sewer project in Topsail Beach, North Carolina. Completed plans call for site work for a water / sewer project.

Provide all labor, materials, and equipment necessary to perform mowing, weed eating and trimming, and leaf-blowing services as specified in the Statement of Work. The contractor must meet all technical acceptability requirements by being registered in SAM without exclusions, submitting recent and relevant past performance for a minimum of two similar contracts completed within the last five years, and providing a technical proposal describing how the work will be performed. Prior contracts must include the contract number, project title, description of work performed, and a point of contact. A valid North Carolina Marine or Building contractor's license is required. All questions must be submitted by March 13, 2026, at 2:00 PM ET, and quotes must be submitted electronically by March 23, 2026, at 2:00 PM ET. A site visit is scheduled for March 11, 2026, at 9:00 AM ET, and interested offerors must RSVP no later than March 9, 2026, at 4:00 PM ET. Location: 1 Shore Line Dr, Topsail Beach, NC 28445 ALL REQUESTS, QUESTIONS, AND QUOTE SUBMISSIONS SHALL BE VIA EMAIL DIRECTED TO DIANA.D.CURL@USACE. ARMY.MIL AND ROSALIND.M.SHOEMAKER@USACE.ARMY.MIL. THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $50,000.00 AND $100,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 2.1. Remove and dispose of up to 36 Pilings up to 12 inches in diameter from the USACE existing Pier, Piling clusters, underwater pilings, and any piling debris at Topsail Beach, NC. If additional pilings are found the Contractor shall submit a Condition Found Report (CFR) to the Contracting Officer's Representative (COR). 2.2. Removal meaning all pilings vertically or horizontal within the designated area shall either be cut at the seabed floor (Horizontal) or removed entirely (Vertical) all Pier bracing, crossmembers and Peir debris.

Award

Water / Sewer

$60,675.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
1
Bidding Soon
374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2026

April 22, 2026

Project location map

1 Shore Line Dr, Topsail Beach, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.