BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Toccoa, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.

Question Deadline 03/20/2026 All questions about the meaning or intent of the Contract Documents are to be directed to ENGINEER. Requests for interpretations of drawings and specifications must be made in writing to the Engineers not later than five (5) days (weekends and holidays not included) prior to receipt of Proposals. The work consists of furnishing all labor, equipment, and materials and performing all work in strict accordance with the plans and specifications for The location of the work is at the Toccoa-R.G. LeTourneau Field, Toccoa, Georgia Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Sponsor, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. Liquidated Damages: Liquidated damages for delays in completion will be One Thousand Dollars ($1000.00) per calendar day. The right to reject any or all bids and to waive informalities is reserved to The sponsor.

Bid Results

Transportation Terminals

$808,233.00

Public - County

Paving, Site Work

16

8

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
161
Bidding Soon
2,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

April 27, 2026

Project location map

2201 E Tugalo St, Toccoa, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.