Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 27, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Toccoa, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.
Question Deadline 03/20/2026 All questions about the meaning or intent of the Contract Documents are to be directed to ENGINEER. Requests for interpretations of drawings and specifications must be made in writing to the Engineers not later than five (5) days (weekends and holidays not included) prior to receipt of Proposals. The work consists of furnishing all labor, equipment, and materials and performing all work in strict accordance with the plans and specifications for The location of the work is at the Toccoa-R.G. LeTourneau Field, Toccoa, Georgia Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Sponsor, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. Liquidated Damages: Liquidated damages for delays in completion will be One Thousand Dollars ($1000.00) per calendar day. The right to reject any or all bids and to waive informalities is reserved to The sponsor.
Bid Results
Transportation Terminals
$808,233.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2026
April 27, 2026
2201 E Tugalo St, Toccoa, GA
Related To This Project
Toccoa, GA
Bid Date: Apr 13 2026
Toccoa, GA
Bid Date: May 21 2026
Toccoa, GA
Bid Date: May 21 2026
Toccoa, GA
Bid Date: Apr 30 2026
Toccoa, GA
Bid Date: Dec 04 2025
Toccoa, GA
Bid Date: Jun 24 2025
Toccoa, GA
Bid Date: Apr 22 2025
Toccoa, GA
Bid Date: Nov 26 2024
Toccoa, GA
Bid Date: Sep 24 2024
Toccoa, GA
Bid Date: Aug 21 2024
Toccoa, GA
Bid Date: Sep 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
