Published March 6, 2026 at 7:00 PM

Updated March 18, 2026

Site work for a water / sewer project in Eugene, Oregon. Completed plans call for site work for a water / sewer project.

Question Deadline 03/10/2026 Prior to the deadline for submitting questions, Bidders may, in writing/email, request clarification of or changes to any bid specifications or Contract terms EWEB requires bids to install approximately 1150 feet of 8-in water main along Myoak Drive. Bidders must meet Minimum Qualifications for Contractor and specialty sub-contractors as defined in the bid packages. The Minimum Qualifications include that the general contractor must have managed or completed, in the past five years, at least three water pipeline or related projects that included the installation of ductile iron water pipeline in paved streets. The proposed construction superintendent must be currently employed by the qualified General Contractor and must have been the superintendent on at least two water pipeline projects in the last five years, which included the installation of ductile iron water pipeline in paved streets. The qualified construction superintendent is required to be on-site full-time and in responsible charge during all construction activities. Bidders must comply with all BOLI and CCB requirements as outlined by the State of Oregon. The Eugene Water & Electric Board (EWEB) requests bids for the installation of approximately 1150 feet of 8-in water main along Myoak Drive. Bidders shall meet Minimum Qualifications for Contractor and specialty sub-contractors, as defined in the bid packages. In summary, these Minimum Qualifications include: General Contractor: a. The general contractor shall have successfully managed/completed, during the past five (5) years, at least (3) water pipeline or related projects that included the installation of ductile iron water pipeline in paved streets. b. The proposed construction superintendent shall be currently employed by the qualified General Contractor and shall have been the construction superintendent on no less than two (2) water pipeline projects during the last five (5) years which included the installation of ductile iron water pipeline in paved streets. The qualified construction superintendent will be required to be on the project site in responsible charge, full-time, during all construction activities. Anticipated Award Date: 04/07/2026

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

9

10

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
42
Bidding Soon
306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 10, 2026

Project location map

Multiple Locations, Eugene, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.