BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2026 at 8:00 PM

Updated April 1, 2026

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; and communication facility.

The project includes widening of the east and north legs of the project intersection to add long-term capacity, and installation of a permanent traffic signal. The improvements include construction of the new traffic signal, approximately 1,600 SY of 9" thick PCC Class C-SUD street pavement, 700 LF of subdrain, one (1) storm sewer manhole and one (1) intake installation, Class 10 excavation, subgrade preparation, modified subbase, paved median, driveways, sidewalks, pavement markings, fiber optic infrastructure, temporary surface restoration, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. The City will furnish the combination traffic signal lighting pole and mast arm assemblies, mast-arm mounted streetname signs, ATC 48VDC cabinet with controller, conflict monitor and accessories, and fiber optic cable for Contractor installation. The Contractor shall substantially complete the overall project within ninety (90) working days. Substantial completion for the overall project shall be defined as all utility, grading, pavement, and traffic signal and fiber optic construction completed; with the pavement markings and signs installed; and the streets, driveways, and sidewalks fully open to traffic and the traffic signal fully operational. A six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days after the punch list has been provided to the Contractor following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The City of Ankeny does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Post-Bid

Roads / Highways

$843,634.00

Public - City

Paving, Site Work

94

9

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
0
Bidding Soon
474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 4, 2026

Project location map

SE Oralabor Rd & SE Four Mile Dr, Ankeny, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.