Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 12, 2026 at 8:00 PM
Updated March 13, 2026
Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a sidewalk / parking lot; and road / highway.
The 2026 PCC Street Patching Program includes the full depth removal and replacement of PCC street pavement at five separate sites located at: East First Street between Ankeny Boulevard and Delaware Avenue; SW White Birch Drive Roundabout and SW Polk City Drive just west of SW State Street; City Hall Parking Lot and Hawkeye Park Parking Lot; SE Shurfine Drive between SE Hulsizer Road and SE Delaware Avenue and SE Hulsizer Road between SE Shurfine Drive and SE Dalbey Drive; and NW Westwood Street just south of NW 5th Street and Carlson Ridge Estates, Diamond Hills, and Tradition Greens Neighborhoods. Construction improvements involve approximately 1,025 SY of 9" thick PCC Class M full depth patches, 2,100 SY of 9" thick PCC Class C-SUD full depth patches, 1,850 SY of 8" thick PCC Class C-SUD street pavement, 650 SY of 8" thick PCC Class C-SUD full depth patches, and 1,750 SY of 7" thick PCC Class C-SUD full depth patches. Other improvements include removal and replacement of storm sewer structures, adjustments to existing storm sewer and sanitary sewer structures, ADA compliant pedestrian ramps, temporary surface restoration, temporary traffic control, maintenance of postal service and solid waste collection, mobilization, and miscellaneous associated work. A truss screed or laser screed must be used for patches greater than or equal to three panels in length. The Contractor must substantially complete each of the five sites within the specified number of working days for each site. No more than two sites shall be worked on at the same time unless approved by the Engineer. Substantial completion for each site includes all utility, grading, and pavement construction completed, temporary surface restoration finished, and pavement open to traffic. Liquidated damages will be assessed if substantial or full completion deadlines are not met.
Award
Roads / Highways
$796,427.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2026
March 16, 2026
Multiple Locations, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Feb 24 2026
Ankeny, IA
Bid Date: Mar 10 2026
Ankeny, IA
Bid Date: Mar 10 2026
Ankeny, IA
Bid Date: Mar 10 2026
Ankeny, IA
Bid Date: Mar 17 2026
Ankeny, IA
Bid Date: Mar 31 2026
Ankeny, IA
Bid Date: Mar 31 2026
Ankeny, IA
Bid Date: Mar 31 2026
Ankeny, IA
Bid Date: Feb 10 2026
Ankeny, IA
Bid Date: Feb 10 2026
Ankeny, IA
--
Ankeny, IA
Bid Date: Jan 27 2026
Ankeny, IA
Bid Date: Jan 29 2026
Ankeny, IA
Bid Date: Jan 20 2026
Ankeny, IA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
