BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The NW 17th Street Storm Sewer & Pavement Improvements project includes reconstructing street pavement and storm sewer structures along NW 17th Street, NW Linden Street, NW Applewood Street, and NW Beechwood Street. The construction improvements include approximately 3,300 SY of 7" thick PCC Class C-SUD street pavement, 380 LF of storm sewer, 1,700 LF of subdrain, Class 10 excavation, subgrade preparation, modified subbase, driveways, sidewalks, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within ninety working days. Stages 1 and 2 of the project shall be substantially completed within eighty working days, and Stage 3 shall be substantially completed within ten working days. Stage 3 construction may take place concurrently with Stage 2 construction if prior approval is obtained from the Engineer. Substantial completion for the overall project is defined as all utility, grading, and pavement construction completed; with the new streets, driveways, and sidewalks fully open to traffic. Working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Liquidated damages of $1,000.00 per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten working days after the punch list has been provided to the Contractor following substantial completion. Full completion is defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Liquidated damages of $500.00 per calendar day will be assessed for work not fully completed within the designated Contract term(s). The City of Ankeny reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Award

Roads / Highways

$661,004.00

Public - City

Paving, Site Work

53

8

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
0
Bidding Soon
507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

April 6, 2026

Project location map

Multiple Locations, Ankeny, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.