Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 3, 2026 at 7:00 PM
Updated March 4, 2026
Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.
The NW 17th Street Storm Sewer & Pavement Improvements project includes reconstructing street pavement and storm sewer structures along NW 17th Street, NW Linden Street, NW Applewood Street, and NW Beechwood Street. The construction improvements include approximately 3,300 SY of 7" thick PCC Class C-SUD street pavement, 380 LF of storm sewer, 1,700 LF of subdrain, Class 10 excavation, subgrade preparation, modified subbase, driveways, sidewalks, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within ninety working days. Stages 1 and 2 of the project shall be substantially completed within eighty working days, and Stage 3 shall be substantially completed within ten working days. Stage 3 construction may take place concurrently with Stage 2 construction if prior approval is obtained from the Engineer. Substantial completion for the overall project is defined as all utility, grading, and pavement construction completed; with the new streets, driveways, and sidewalks fully open to traffic. Working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Liquidated damages of $1,000.00 per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten working days after the punch list has been provided to the Contractor following substantial completion. Full completion is defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Liquidated damages of $500.00 per calendar day will be assessed for work not fully completed within the designated Contract term(s). The City of Ankeny reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.
Award
Roads / Highways
$661,004.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2026
April 6, 2026
Multiple Locations, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Feb 10 2026
Ankeny, IA
Bid Date: Feb 24 2026
Ankeny, IA
Bid Date: Feb 24 2026
Ankeny, IA
Bid Date: Feb 24 2026
Ankeny, IA
Bid Date: Mar 10 2026
Ankeny, IA
Bid Date: Mar 31 2026
Ankeny, IA
Bid Date: Mar 31 2026
Ankeny, IA
Bid Date: Mar 26 2026
Ankeny, IA
--
Ankeny, IA
Bid Date: Jan 27 2026
Ankeny, IA
Bid Date: Jan 29 2026
Ankeny, IA
Bid Date: Jan 20 2026
Ankeny, IA
--
Ankeny, IA
Bid Date: Dec 16 2025
Ankeny, IA
Bid Date: Dec 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
