Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2026 at 7:00 PM

Updated March 7, 2026

Site work and paving for a mixed-use development in Lake Wilson, Minnesota. Conceptual plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

MnDOT requests letters of interest for preliminary and final design services for SP 5904-27. SP 5904-27 is a medium mill and overlay along Trunk Highway (TH) 30 from TH 75 in the City of Pipestone to 60th Avenue in the City of Lake Wilson. There will be ADA improvements and some storm sewer work within the City of Lake Wilson. This project also includes 5 bridge box culvert replacements (nos. 4566, 4468, 8173, 8716, 8172) and an additional 10 centerline culvert replacements (9 box culverts). Prospective, pre-qualified responders who have any questions regarding this Announcement must submit questions, by email, to the Contract Administrator: Gretchen Warner-Rhubee Gretchen.Warner-Rhubee@state.mn.us Questions regarding this Announcement must be received, via e-mail, by the Contact Administrator identified above no later than 2:00PM Central Time on 03/10/2026. MnDOT anticipates posting answers to all questions received by 2:00PM Central Time on 03/13/2026 MNDOT: RFQ Engineering - Preliminary and Final Design for State Project

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
30
Bidding Soon
429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2027

Project location map

State Hwy 30, Lake Wilson, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed