BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Aspen, Colorado. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and sidewalk / parking lot.

Bid is cancelled. Reference Number 0000415562 The goal of this project is to install a rapid flash beacon, add new crosswalk markings, and improve sidewalk accessibility to increase safety and convenience for people using the bus stop at Cemetery Lane and Snowbunny/Silverking. The project will install a new concrete pedestrian area, install rapid flash beacon crossing signs, and do other associated concrete and drainage work to improve the ability for pedestrians to utilize the bus stop. Scope of Work Concrete bump out Concrete pad with ADA Ramps Pavement striping RRFB installation Guardrail Other associated concrete work Electric conduits for RRFB and additional conduit for future we-cycle station Trench drain and associated piping Detail grading City of Aspen Engineering will handle all permitting requirements Reference Contract Documents for further detail. Special Conditions of note: 1. Trail Access during construction 2. Cemetery Lane Access during construction 3. Material staging 4. Project Schedule Question Deadline 05/13/2026 at 11:59 PM MT Questions are submitted online Yes All Work Shall be Completed by October 31st, 2026 Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % The City reserves the right to reject any or all bids or accept what is, in its judgment, the bid which is in the City's best interest. The City further reserves the right, in the best interests of the City, to accept a late submittal or to waive any technical defects or irregularities in any and all bids submitted. The goal of this project is to install a rapid flash beacon, add new crosswalk markings, and improve sidewalk accessibility to increase safety and convenience for people using the bus stop at Cemetery Lane and Snowbunny/Silverking. The project will install a new concrete pedestrian area, install rapid flash beacon crossing signs, and do other associated concrete and drainage work to improve the ability for pedestrians to utilize the bus stop.

Final Planning

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

23

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

November 11, 2026

Project location map

Cemetery Ln, Aspen, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.