Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Aspen, Colorado. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and sidewalk / parking lot.
Bid is cancelled. Reference Number 0000415562 The goal of this project is to install a rapid flash beacon, add new crosswalk markings, and improve sidewalk accessibility to increase safety and convenience for people using the bus stop at Cemetery Lane and Snowbunny/Silverking. The project will install a new concrete pedestrian area, install rapid flash beacon crossing signs, and do other associated concrete and drainage work to improve the ability for pedestrians to utilize the bus stop. Scope of Work Concrete bump out Concrete pad with ADA Ramps Pavement striping RRFB installation Guardrail Other associated concrete work Electric conduits for RRFB and additional conduit for future we-cycle station Trench drain and associated piping Detail grading City of Aspen Engineering will handle all permitting requirements Reference Contract Documents for further detail. Special Conditions of note: 1. Trail Access during construction 2. Cemetery Lane Access during construction 3. Material staging 4. Project Schedule Question Deadline 05/13/2026 at 11:59 PM MT Questions are submitted online Yes All Work Shall be Completed by October 31st, 2026 Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % The City reserves the right to reject any or all bids or accept what is, in its judgment, the bid which is in the City's best interest. The City further reserves the right, in the best interests of the City, to accept a late submittal or to waive any technical defects or irregularities in any and all bids submitted. The goal of this project is to install a rapid flash beacon, add new crosswalk markings, and improve sidewalk accessibility to increase safety and convenience for people using the bus stop at Cemetery Lane and Snowbunny/Silverking. The project will install a new concrete pedestrian area, install rapid flash beacon crossing signs, and do other associated concrete and drainage work to improve the ability for pedestrians to utilize the bus stop.
Final Planning
Sidewalks / Parking Lot
$600,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
23
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2026
November 11, 2026
Cemetery Ln, Aspen, CO
Related To This Project
Aspen, CO
Bid Date: Mar 23 2026
Aspen, CO
Bid Date: Mar 23 2026
Aspen, CO
Bid Date: Jul 02 2020
Aspen, CO
--
Aspen, CO
Bid Date: May 27 2026
Aspen, CO
Bid Date: Mar 26 2026
Aspen, CO
Bid Date: Mar 13 2026
Aspen, CO
Bid Date: Feb 26 2026
Aspen, CO
Bid Date: Mar 11 2026
Aspen, CO
Bid Date: Mar 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
