Renovation of a mixed-use development in Saint Johns, Michigan. Completed plans call for the renovation of a theater / auditorium.
Remove existing floor and dispose. Contractor is responsible for protection of surrounding space and doors from damage and for providing a dumpster. The concrete slabs on or below grade must be adequately waterproofed beneath the slab and at the perimeter walls and on earth side of below grade walls by the general contractor using a suitable membrane. The basis of design shall be Plyron sheeting. Manufacturer must be a MFMA Mill Member in good standing, experienced in the field, and have been in business for at least ten years; Action Floor Systems, LLC or an approved equal. Floor system manufacturer must be solvent with no bankruptcy proceedings in the previous seven years and must be registered in the Collaborative for High Performance Schools (CHPS) Product Database. The flooring contractor must be approved by Action Floor Systems, LLC. Sub-contractors are not allowed on this project. The wood flooring shall not be installed until all masonry, plastering, tile, marble, and terrazzo work is completed, and overhead mechanical trades and painters have finished in the wood floor area. The building must be reasonably dry, with all openings closed in and permanent heating and air conditioning installed and operating. The concrete subfloor must be dry, free of foreign materials, and broom clean. Indoor relative humidity should be maintained between 35 percent and 50 percent, and air temperatures between 55 degrees and 75 degrees. Install whole sheets starting at the front with the first piece centered on the stage and continue out from center spacing each panel a dime width apart for expansion. The second and continuing rows must be installed in a running bond pattern. Fasteners shall be installed 3 screws by 5 screws equally spaced on each panel starting 3 inches from the edge. Abrade floor with 180 grit sandpaper, vacuum and tack the floor before painting. Finish with 2 coats of matte black stage paint in accordance with manufacturer's recommendations. Affix rubber base to wall, miter all corners, use pre-molded outside corners, and install aluminum thresholds as required. Clean up all unused materials and debris and remove from premises, properly disposing of all waste materials. Upon completion, care and maintenance instructions of the MFMA must be followed. Failure to do so may void warranty. Questions on bidding procedures and bid specifications may be directed to either Robbie Gleeson, Director of Operations at 989-227-4057.
Post-Bid
Educational
$40,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.