BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a mixed-use development in Saint Johns, Michigan. Completed plans call for the renovation of a theater / auditorium.

Remove existing floor and dispose. Contractor is responsible for protection of surrounding space and doors from damage and for providing a dumpster. The concrete slabs on or below grade must be adequately waterproofed beneath the slab and at the perimeter walls and on earth side of below grade walls by the general contractor using a suitable membrane. The basis of design shall be Plyron sheeting. Manufacturer must be a MFMA Mill Member in good standing, experienced in the field, and have been in business for at least ten years; Action Floor Systems, LLC or an approved equal. Floor system manufacturer must be solvent with no bankruptcy proceedings in the previous seven years and must be registered in the Collaborative for High Performance Schools (CHPS) Product Database. The flooring contractor must be approved by Action Floor Systems, LLC. Sub-contractors are not allowed on this project. The wood flooring shall not be installed until all masonry, plastering, tile, marble, and terrazzo work is completed, and overhead mechanical trades and painters have finished in the wood floor area. The building must be reasonably dry, with all openings closed in and permanent heating and air conditioning installed and operating. The concrete subfloor must be dry, free of foreign materials, and broom clean. Indoor relative humidity should be maintained between 35 percent and 50 percent, and air temperatures between 55 degrees and 75 degrees. Install whole sheets starting at the front with the first piece centered on the stage and continue out from center spacing each panel a dime width apart for expansion. The second and continuing rows must be installed in a running bond pattern. Fasteners shall be installed 3 screws by 5 screws equally spaced on each panel starting 3 inches from the edge. Abrade floor with 180 grit sandpaper, vacuum and tack the floor before painting. Finish with 2 coats of matte black stage paint in accordance with manufacturer's recommendations. Affix rubber base to wall, miter all corners, use pre-molded outside corners, and install aluminum thresholds as required. Clean up all unused materials and debris and remove from premises, properly disposing of all waste materials. Upon completion, care and maintenance instructions of the MFMA must be followed. Failure to do so may void warranty. Questions on bidding procedures and bid specifications may be directed to either Robbie Gleeson, Director of Operations at 989-227-4057.

Post-Bid

Educational

$40,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

April 27, 2026

Project location map

501 W Sickles St, Saint Johns, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.