Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 15, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Statesville, North Carolina. Completed plans call for site work for a water / sewer project.
A request for proposals is being issued for the replacement of WTP flocculators and flash mixer. Bids are to be received at 227 S. Center Street, Basement, Statesville, NC 28677, on or before 2:00 p.m. EST on April 10, 2026, at which time and place the bids will be publicly opened and read. A minimum of three bids must be received for all bids to be opened. Participation is encouraged from businesses owned by minorities, women, disabled, disabled business enterprises, and non-profit work centers for the blind and severely disabled. any questions regarding this request, contact Harry Hull, Public Utilities Supervisor, at 704-878-3441 or email hhull@statesvillenc.net. A. Provide all labor, materials, equipment, anchorage systems, and incidentals necessary for the installation, testing, and placing into operation twenty (20) flocculators, one (1) flash mixer, and twenty (20) NEMA 4X VFDs and one (1) VFD control panel in NEMA 4x Enclosure, and associated appurtenances at the Statesville Water Treatment Plant. B. For the purposes of this Section, "Manufacturer" shall mean the designer, manufacturer, supplier and tester of the replacement equipment. The Manufacturer shall be responsible for the design, coordination, testing, and satisfactory performance of all the components. Inclusion of a specific manufacturer's name in the Specifications does not mean that the specific manufacturer's standard product will be acceptable. Specified manufacturer's or other manufacturer's standard product shall be modified as required to meet the Specifications. C. The Manufacturer shall have unit responsibility for coordinating the proper equipment mounting system to ensure stable equipment operation. The Contractor shall install, anchor, test, and align the equipment such that vibration levels are within Manufacturer's recommended tolerances. The Contractor shall provide all supports, stiffeners, etc., that may be required to provide systems that operate reliably and within vibration limits specified by the Manufacturer. D. All equipment shall be suitable for continuous operation (24 hours per day, 365 days per year). E. The Manufacturer shall have a factory authorized service center within 2 hour driving time of the project location that is capable of performing a complete repair of the flocculator and flash mixer units. The service center should have adequate equipment, inventory and personnel to perform repairs and rebuilds to the equipment. The service center shall have complete push-pull equipment and crews which can be onsite within 24 hours of notification. Service centers without in-house push-pull capabilities will not be acceptable.
Bid Results
Water / Sewer
$811,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
