BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2026 at 8:00 PM

Updated March 10, 2026

Site work for a mixed-use development in Moberly, Missouri. Conceptual plans call for site work for a transportation facility.

The City of Moberly, Missouri is soliciting statements of qualifications and experience from qualified consultants for airfield development projects at the Omar N. Bradley Regional Airport. Projects may be subject to Federal funding through the Federal Aviation Administration (FAA) Airport Improvement Program as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program. Potential projects include replacing the AvGas and Jet-A fuel systems and constructing a T-Hangar. Required services include engineering for preliminary, design, bidding, and construction phases, as well as geotechnical work, categorical exclusion documentation preparation, as-built ALP updates, and surveying. Consultants should list preferred firms for sub-consulted work, with changes allowed upon Sponsor approval. Selection may apply to projects initiated within five years or until project completion, and other projects will require new solicitation unless otherwise permitted. Selection will utilize a qualification-based process conforming to FAA guidelines, with criteria including recent airport project experience, capability, schedule and budget adherence, knowledge of FAA/MoDOT standards and regulations, quality of previous work, personnel qualifications, project familiarity/proximity, and an implemented Affirmative Action Program. Fee or cost information should not be included in responses. Overhead rates must comply with Federal Regulation 48 CFR Part 31. The selected firm must submit their current overhead rate audit certification or MoDOT pre-qualification. Agreements will be subject to all applicable Federal Rules and Regulations. Consultants must submit three copies of their qualifications and experience statements with references, as well as an affidavit of compliance with the federal work authorization program and a copy of the firm’s E-Verify Memorandum of Understanding. The outside of the envelope should be clearly marked: Airport Consultant RFQ. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Transportation Terminals

$1,500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2026

Project location map

3600 E Outer Rd, Moberly, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.