Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a power facility in Philadelphia, Pennsylvania. Completed plans call for site work for a power facility.
FCA-1 Substation Relocation at Philadelphia International Airport. Bid No. 6706 PHL-1666.35. Bid range is greater than $5,000,000. Quotes must be submitted electronically on the designated platform. No quotes will be accepted unless a complete Questionnaire and Financial Statement, with all questions fully answered, is filed within Pre-Qualification Solicitation B2626364 on the specified platform. Instructions include obtaining bid package documents electronically from the provided website and submitting all quotes before the stated deadline. Pre-qualification requirements: A complete Questionnaire and Financial Statement with all questions fully answered must be filed within Pre-Qualification Solicitation B2626364 on the specified website. PROJECT DESCRIPTION A. This project includes the replacement of the FCA-1 Substation located in Terminal A-East at the Philadelphia International Airport. This replacement includes the low voltage switchgear, MV transformers and MV switches. The substation is fed from 15kV lines #13 & #14 from the Main Terminal Substation. The existing transformers and switches will be replaced outdoors on an elevated platform, and the new switchgear will be housed on the roof of the existing substation room. All client design standards and city and national design standards outlined in the 2024 PHL AE Design Standards will be adhered to in this project. The low-voltage feeders will penetrate through the roof from the new switchgear to re-connect to their distribution panels. Major tasks in this project include: a. Demolition of existing switchgear at substation FCA-1. b. Structural and architectural designs for supporting/housing new equipment. c. Temporarily feeding existing loads during construction. d. Installing and testing new switchgear equipment and related accessories. e. Phasing and minimizing power outages during construction with temporary power solutions.
Bid Results
Power Plant
$7,999,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
