BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work for a water / sewer project in Montgomery, Alabama. Completed plans call for site work for a water / sewer project.

The contractor shall furnish all labor, materials, and equipment necessary to perform the complete replacement of the M500 water main serving Building 500 at Maxwell Air Force Base, including all associated construction activities required to execute Project PNQS260340. Work must comply with the applicable Davis-Bacon wage determination AL260093 and all technical specifications, with performance executed in a manner meeting evaluation criteria established for a Lowest Price Technically Acceptable or Trade-off award. This requirement is a total small-business set-aside, and contractors must be located within a 250-mile radius of Maxwell AFB to be eligible for award. Location: Maxwell Air Force Base, 50 LeMay Plaza South, Montgomery, AL 36112 The Magnitude of Construction is between $200,000 and $250,000 Questions and Responses due date and time to 10 March 2026 @ 12:00pm. Questions and Responses to this notice must be provided in writing via e-mail to the CS, Lauryn Setzer, 334-953-6550, lauryn.setzer@us.af.mil,and Alternate CS, Sean Johnson, 334-953-2599, sean.johnson.54@us.af.mil. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work generally consists of the following: a. Excavate the section of existing carbon-based pipe outside of Building 500. b. Excavation depths range from approximately 4 feet to approximately 7.5 feet. c. Remove the existing section that is approximately 100' long. d. Replace with a section of water pipe approximately 100' long. e. Pipe grade shall be ANSI/AWWA C900, or equivalent. f. All work must meet state, federal codes and comply with OSHA standards. g. Service Provider, at the conclusion of the project, shall ensure any disturbed areas are restored to an "as was" condition; disturbed turf shall be addressed, tire marks/ruts, as well as any damaged caused to tile and concrete cart paths/sidewalks shall be restored. h. Service Provider shall maintain a clear, hazard free, safe workplace always and ensure the site is secured and free of safety hazards at the end of each day.

Post-Bid

Water / Sewer

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
41
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

April 20, 2026

Project location map

Maxwell AFB,, Montgomery, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.