Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 24, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Saukville, Wisconsin. Working plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of April 24, 2026 bids was rejected. No definite date for the rebid. Project involves the Base Bid of directional drilling 5,100 L.F. of 12" water main with required appurtenances, 250 L.F. of concrete curb and gutter removal and replacement, 700 S.Y. asphaltic pavement patching, 445 L.F. of 12" water main jack and bored with 24" casing pipe and landscaping. Mandatory Alternate Bid involves open cut of 5,100 L.F. of 12" water main with required appurtenances in both spoil and granular backfill, 3,300 S.Y. asphaltic pavement patching and landscaping. All Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Village of Saukville and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Saukville reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Pre-Qualification: Yes A Bidder's qualification statement must be delivered to Village of Saukville at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Saukville equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Saukville as liquidated damages. Project includes, but is not limited to, constructing 5084 lineal feet of 12" watermain by either directional drill or open cut. Included, but not limited to, are all appurtenances including valves, hydrants, services, and abandoning existing watermain.
Final Planning
Water / Sewer
$1,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
October 24, 2026
Multiple Locations, Saukville, WI
Related To This Project
Saukville, WI
Bid Date: Apr 07 2026
Saukville, WI
Bid Date: May 07 2026
Saukville, WI
Bid Date: Jun 17 2025
Saukville, WI
Bid Date: Mar 20 2025
Saukville, WI
Bid Date: Feb 13 2025
Saukville, WI
Bid Date: Sep 18 2024
Saukville, WI
--
Saukville, WI
Bid Date: Sep 09 2025
Saukville, WI
Bid Date: Apr 14 2026
Saukville, WI
Bid Date: Jul 02 2024
Saukville, WI
Bid Date: Jul 09 2025
Saukville, WI
--
Saukville, WI
Bid Date: Jan 25 2022
Saukville, WI
--
Saukville, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
