Published April 2, 2026 at 8:00 PM

Updated April 3, 2026

Demolition and site work for a civil project in Richmond, California. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Electronic Bids are invited for the Sodium Hypochlorite Tank Replacement Project. All required sections of the Bid must be submitted via the Citys secure online bidding system. Contractors are solely responsible for timely electronic submission, as late Bids will not be accepted. Contractors will receive an e-bid confirmation number and timestamp upon successful submission. Only bids received through the online system will be considered. Q&A Deadline 03/10/2026 5:00 PM (PDT) Online Q&A Yes Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% There are three (3) existing 10,300 gallon Sodium Hypochlorite (SHC) tanks at the Richmond Water Pollution Control Plant (WPCP), that are beyond their useful life and will therefore be replaced through this project. The tank’s ancillary equipment and systems will be replaced as well. The Contractor’s bid should include all labor, supervision, material, supplies, equipment, inspections, and any other incidentals required for the work as described in this Scope of Work, and as supplemented by the bid documents. The Contractor's firm is presumed to hold all necessary licenses and other qualifications, and the work will be required to meet all local, state and federal codes, laws, rules and regulations. Any discrepancies Contractor may discover among the Scope of Work, and applicable laws, rules, codes, or regulations should be brought to Veolia’s attention with Contractor’s quotation. For purposes of pricing the work, the Contractor should assume that the most stringent of the foregoing requirements will apply to your work. Should the Contractor be awarded a subcontract, no additional compensation will be granted for compliance with any of these requirements. The Contractor shall consider and acknowledge that they will be working on an operating treatment facility, and therefore, the construction work shall not interrupt or disrupt normal operations. All the work shall be scheduled and performed in a way that sodium hypochlorite is available for disinfection 24/7, no exceptions. The Contractor shall consider the use of temporary totes, or similar, to accommodate this requirement during shutdowns, tie-ins, demolition, etc. VEOLIA-PROVIDED ITEMS: Veolia will be responsible for providing the following materials and services for this project. Any item or material not mentioned in this list shall be procured by the Contractor. ? Three (3) new double-wall sodium hypochlorite storage tanks complete with seismic restraint cables. Contractors shall price their proposals based on early-mid 2026 construction timeline. ? Three (3) new tank level sensors and associated local displays ? Asset IDs for equipment tagging (only IDs, not the tags themselves)

Bid Results

Water / Sewer

$395,260.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
477
Active Projects
226
Bidding Soon
2,442
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

May 25, 2026

Project location map

Multiple Locations, Richmond, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.